EMERSON APPLIANCE CONTROLS (WATCH, CLOCK, AND PART MANUFACTURING)

Manufacturing

Clinton County, Indiana

DC Readiness
52.4
Fair / 100

EMERSON APPLIANCE CONTROLS (WATCH, CLOCK, AND PART MANUFACTURING) is a manufacturing datacenter candidate site in Clinton County, Indiana. It screens at 52.4/100 DC Readiness.

Power & interconnection

Speed to power

Connectivity

Nearest IXPWintek Corporation
IXP distance19.6 mi

Site characteristics

Site typeManufacturing

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score68/100

Location context

Nearest datacenterWintek Corporation
DC distance19.6 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.20¢/kWh
Industrial electricity8.21¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$9,492

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
49
Fiber connectivity12%
60
Energy cost10%
50
Water risk8%
90
Natural hazard8%
68
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Clinton County, ranked by DC Readiness.

Sites near EMERSON APPLIANCE CONTROLS (WATCH, CLOCK, AND PART MANUFACTURING)
SiteTypeVoltageCapacityQueue waitScore
FRANKFORTSubstation-Adjacent230 kV300 MW3.0 yrs69.5
THORNTOWNSubstation-Adjacent230 kV300 MW3.0 yrs66.1
Greenfield (CAYUGA - FRANKFORT)Greenfield230 kV300 MW4.6 yrs62.6
Greenfield (THORNTOWN - KOKOMO HIGHLAND PA)Greenfield230 kV300 MW3.0 yrs60.8
Greenfield (THORNTOWN - KOKOMO HIGHLAND PA)Greenfield230 kV300 MW3.0 yrs60.5
Greenfield (NEW LONDON - LAFAYETTE 230)Greenfield230 kV300 MW3.0 yrs60.5
Greenfield (NEW LONDON - FRANKFORT)Greenfield230 kV300 MW3.0 yrs60.5
Greenfield (NEW LONDON - FRANKFORT)Greenfield230 kV300 MW3.0 yrs57.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EMERSON APPLIANCE CONTROLS (WATCH, CLOCK, AND PART MANUFACTURING), Clinton County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.