Skip to content
Gridcensus

UNKNOWN121983

Substation-Adjacent

Will, Illinois · PJM

DC Readiness
58.1
Good / 100

UNKNOWN121983 is a substation-adjacent datacenter candidate site in Will, Illinois, interconnecting through PJM. It screens at 58.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 4.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN121983
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityCOMMONWEALTH EDISON COinvestor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookConstrained
≈ 6.1 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth393
Avg queue wait4.8 yrs
Recent queue wait6.1 yrs
Completion rate21%
Withdrawal rate79%

Connectivity

Nearest IXPNETRIX - ALSIP
IXP distance19.2 mi
Fiber providers13
Fiber coverage27.3%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterDatacenter (386)
DC distance15.3 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.86¢/kWh
Industrial electricity5.29¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$10,259

Regulatory climate

Restrictivestate posture · as of 2026-08

New-DC state tax exemptions suspended for 2 years (from Jul 2026).

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN121983

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
47
Fiber connectivity12%
67
Energy cost10%
50
Water risk7%
88
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in Will, ranked by DC Readiness.

Sites near UNKNOWN121983
SiteTypeVoltageCapacityQueue waitScore
JOLIETSubstation-Adjacent345 kV600 MW4.8 yrs67.4
TAP138173Substation-Adjacent345 kV600 MW4.8 yrs65.4
WILTONSubstation-Adjacent765 kV1,000 MW4.8 yrs65.4
UNKNOWN124429Substation-Adjacent345 kV600 MW4.8 yrs65.2
EAST FRANKFORTSubstation-Adjacent345 kV600 MW4.8 yrs64.7
LOCKPORTSubstation-Adjacent345 kV600 MW4.8 yrs64.7
GOODINGS GROVESubstation-Adjacent345 kV600 MW4.8 yrs64.6
TAP138156Substation-Adjacent345 kV600 MW4.8 yrs64.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN121983, Will is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.