Jose Ayala Property

Industrial

Vermilion County, Illinois · MISO

DC Readiness
49.3
Fair / 100

At a glance

Jose Ayala Property is an industrial datacenter candidate site in Vermilion County, Illinois, scoring 49.3/100 DC Readiness — 82nd of 88 scored sites in the county. It sits in the MISO grid region and the EASTERN ILLINOIS ELEC COOP service territory, where interconnection has averaged 4.8 years from request to operation.

Power & interconnection

UtilityEASTERN ILLINOIS ELEC COOPcooperativemoderate to large load · state default

Speed to power

Interconnection outlookConstrained
≈ 6.1 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionMISO
Queue depth277
Avg queue wait4.8 yrs
Recent queue wait6.1 yrs
Completion rate21%
Withdrawal rate79%

Connectivity

Nearest IXPWintek Corporation
IXP distance34.3 mi
Fiber providers6
Fiber coverage39.5%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterAgricultural and Biological Engineering
DC distance33.0 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.58¢/kWh
Industrial electricity5.84¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$6,777

Regulatory climate

Restrictivestate posture · as of 2026-08

New-DC state tax exemptions suspended for 2 years (from Jul 2026).

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Jose Ayala Property

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Jose Ayala Property compare with other sites in Vermilion County?

Jose Ayala Property ranks 82nd of 88 scored candidate sites in Vermilion County. Its 49.3/100 is roughly in line with the county average of 51.9. It is roughly in line with the Illinois average of 54.3 and roughly in line with the national average of 53.2.

Against the Illinois average, its strongest sub-score is natural hazard (65 vs 63) and its weakest is fiber connectivity (60 vs 71). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Jose Ayala Property to power, fiber and other datacenters?

The nearest located transmission bottleneck is Kokomo - Tipton W. 230kV l/o Nucor - Cayuga 345kV (PJM), 75 miles away. For connectivity, the nearest internet exchange facility is Wintek Corporation at 34.3 miles. 6 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Agricultural and Biological Engineering, 33 miles away.

What are the flood, water and hazard risks at Jose Ayala Property?

At the county level, FEMA's National Risk Index rates Vermilion County "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
47
Fiber connectivity12%
60
Energy cost10%
50
Water risk7%
88
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in Vermilion County, ranked by DC Readiness.

Sites near Jose Ayala Property
SiteTypeVoltageCapacityQueue waitScore
TAP138267Substation-Adjacent345 kV600 MW4.8 yrs62.2
EC Coal Vermilion CountyGreenfield——4.8 yrs58.7
EC Coal Vermilion CountyGreenfield——4.8 yrs58.4
EC Near VermilionGreenfield——4.8 yrs58.4
OZ VermilionGreenfield——4.8 yrs58.3
EC Coal Vermilion CountyGreenfield——4.8 yrs58.2
EC Coal Vermilion CountyGreenfield——4.8 yrs58.2
UNKNOWN123130Substation-Adjacent138 kV100 MW4.8 yrs58.1

Jose Ayala Property: common questions

What is the DC Readiness score of Jose Ayala Property?

Jose Ayala Property scores 49.3/100 on the GridCensus DC Readiness scale, rated fair. It ranks 82nd of 88 scored sites in Vermilion County. The Vermilion County average is 51.9 and the Illinois average is 54.3.

Which electric utility serves Jose Ayala Property?

EASTERN ILLINOIS ELEC COOP (cooperative) holds the retail service territory that contains the site.

What grid region is Jose Ayala Property in?

Jose Ayala Property is in the MISO region. Projects interconnecting there have averaged a 4.8-year wait from queue request to operation.

How far is Jose Ayala Property from an internet exchange?

The nearest internet exchange facility is Wintek Corporation, about 34.3 miles away; 6 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Jose Ayala Property, Vermilion County, IL”, https://gridcensus.com/datacenter-sites/illinois/vermilion-county/jose-ayala-property-b28c7256 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Jose Ayala Property, Vermilion County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.