Greenfield (TAP139468 - CAHOKIA)

Greenfield

St. Clair County, Illinois · PJM

DC Readiness
55.6
Good / 100

Greenfield (TAP139468 - CAHOKIA) is a greenfield datacenter candidate site in St. Clair County, Illinois, interconnecting through PJM. It screens at 55.6/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP139468
Substation voltage230 kV
Available capacity300 MW
UtilitySOUTHWESTERN ELECTRIC COOP INC - (IL)cooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth393
Avg queue wait3.8 yrs

Connectivity

Nearest IXPNetrality St. Louis - 900 Walnut
IXP distance20.0 mi
Fiber providers10
Fiber coverage37.0%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterTierPoint St Louis
DC distance20.2 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.18¢/kWh
Industrial electricity3.59¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$9,310

Regulatory climate

Restrictivestate posture · as of 2026-08

New-DC state tax exemptions suspended for 2 years (from Jul 2026).

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (TAP139468 - CAHOKIA)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power20%
49
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
88
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in St. Clair County, ranked by DC Readiness.

Sites near Greenfield (TAP139468 - CAHOKIA)
SiteTypeVoltageCapacityQueue waitScore
OZ St. ClairGreenfield——4.6 yrs64.3
TURKEY HILLSubstation-Adjacent345 kV600 MW3.8 yrs64.2
Belleville Landfill ProjectBrownfield138 kV13 MW3.8 yrs64.0
TAP156135Substation-Adjacent138 kV100 MW3.8 yrs59.5
UNKNOWN157809Substation-Adjacent138 kV100 MW3.8 yrs59.5
PORTER RDSubstation-Adjacent138 kV100 MW3.8 yrs59.4
E BELLEVILLESubstation-Adjacent138 kV100 MW3.8 yrs59.2
S BELLEVILLESubstation-Adjacent138 kV100 MW3.8 yrs59.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.