EC Near Dallman

Greenfield

Sangamon County, Illinois · PJM

DC Readiness
54.6
Fair / 100

EC Near Dallman is a greenfield datacenter candidate site in Sangamon County, Illinois, interconnecting through PJM. It screens at 54.6/100 DC Readiness and a 4.6 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_COMED
Wholesale LMP$33.95/MWh
Utility commercial rate0.11¢/kWh
UtilityMENARD ELECTRIC COOPcooperativemoderate to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 2.9 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionPJM
Queue depth393
Avg queue wait4.6 yrs
Recent queue wait2.9 yrs
Completion rate21%
Withdrawal rate79%

Connectivity

Nearest IXPSFN IL-Peoria
IXP distance68.2 mi
Fiber providers14
Fiber coverage61.0%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance175.8 mi

Site characteristics

Site typeGreenfield
Land contactSangamon County Assessor
Land owner typeprivate
Buildability50.0/100
Former usenear retired coal plant (10km)

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score65/100
Construction cost index112.1 (avg 100)

Location context

Nearest datacenterSFN IL-Peoria
DC distance68.2 mi
Nearest rail6.9 mi
Nearest gas pipeline2.0 mi
Nearest fiber route134.3 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.59¢/kWh
Industrial electricity7.10¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$7,261

Regulatory climate

Restrictivestate posture · as of 2026-08

New-DC state tax exemptions suspended for 2 years (from Jul 2026).

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Dallman

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
47
Fiber connectivity12%
63
Energy cost10%
87
Water risk7%
88
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
25
Land / acreage3%
40
Construction cost3%
57
Gas pipeline2%
94
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in Sangamon County, ranked by DC Readiness.

Sites near EC Near Dallman
SiteTypeVoltageCapacityQueue waitScore
AUSTINSubstation-Adjacent345 kV600 MW3.8 yrs62.7
LANESVILLESubstation-Adjacent345 kV600 MW3.8 yrs62.7
PAWNEESubstation-Adjacent345 kV600 MW3.8 yrs62.7
TAP139415Substation-Adjacent138 kV100 MW3.8 yrs59.2
EC Coal Sangamon CountyGreenfield——4.6 yrs58.5
EC Near DallmanGreenfield——4.6 yrs58.0
EC Coal Sangamon CountyGreenfield——4.6 yrs57.7
UNKNOWN122769Substation-Adjacent138 kV100 MW3.8 yrs56.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Dallman, Sangamon County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.