EC Coal Sangamon County

Greenfield

Sangamon County, Illinois · PJM

DC Readiness
57.5
Good / 100

EC Coal Sangamon County is a greenfield datacenter candidate site in Sangamon County, Illinois, interconnecting through PJM. It screens at 57.5/100 DC Readiness and a 4.6 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_COMED
Wholesale LMP$33.95/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth265
Avg queue wait4.6 yrs
Recent queue wait2.9 yrs
Completion rate21%
Withdrawal rate79%

Connectivity

Nearest IXPSFN IL-Peoria
IXP distance71.8 mi
Fiber providers13
Fiber coverage60.3%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance190.1 mi

Site characteristics

Site typeGreenfield
Parcel ownerAMEREN ILLINOIS COMPANY
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops
Former usecoal adjacent

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score65/100
Construction cost index91.5 (avg 100)

Location context

Nearest datacenterDatacenter 01133944585
DC distance63.4 mi
Nearest rail1.0 mi
Nearest gas pipeline7.7 mi
Nearest fiber route128.7 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.59¢/kWh
Industrial electricity7.10¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$7,261

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
44
Fiber connectivity12%
67
Energy cost10%
87
Water risk8%
91
Natural hazard8%
65
Buildability7%
65
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
74
Gas pipeline2%
75
Tax incentive2%
100
Climate / cooling2%
70

Nearby comparable sites

Other scored datacenter candidate sites in Sangamon County, ranked by DC Readiness.

Sites near EC Coal Sangamon County
SiteTypeVoltageCapacityQueue waitScore
AUSTINSubstation-Adjacent345 kV600 MW4.6 yrs69.6
PAWNEESubstation-Adjacent345 kV600 MW4.6 yrs69.2
LakesideBrownfield75 MW66.3
TAP139416Substation-Adjacent138 kV100 MW4.6 yrs65.9
Greenfield (MEREDOSIA - AUSTIN)Greenfield345 kV600 MW4.6 yrs65.7
TAP139413Substation-Adjacent138 kV100 MW4.6 yrs65.5
UNKNOWN122095Substation-Adjacent138 kV100 MW4.6 yrs65.3
UNKNOWN122769Substation-Adjacent138 kV100 MW4.6 yrs64.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Coal Sangamon County, Sangamon County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.