Greenfield (UNKNOWN121869 - UNKNOWN121872)

Greenfield

Johnson County, Illinois · PJM

DC Readiness
52.1
Fair / 100

Greenfield (UNKNOWN121869 - UNKNOWN121872) is a greenfield datacenter candidate site in Johnson County, Illinois, interconnecting through PJM. It screens at 52.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN121869
Substation voltage161 kV
Available capacity100 MW
UtilitySOUTHEASTERN IL ELEC COOP, INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth393
Avg queue wait3.8 yrs

Connectivity

Nearest IXPQuad State Internet METRO1 Colocation
IXP distance27.7 mi
Fiber providers5
Fiber coverage67.4%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterQuad State Internet METRO1 Colocation
DC distance27.7 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.38¢/kWh
Industrial electricity5.29¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$4,327

Regulatory climate

Restrictivestate posture · as of 2026-08

New-DC state tax exemptions suspended for 2 years (from Jul 2026).

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 5 nearby

Get alerts

Track Greenfield (UNKNOWN121869 - UNKNOWN121872)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
32
Speed to power20%
49
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
88
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in Johnson County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN121869 - UNKNOWN121872)
SiteTypeVoltageCapacityQueue waitScore
OZ JohnsonGreenfield——4.6 yrs61.4
EC Coal Johnson CountyGreenfield——4.6 yrs60.3
EC FFE Johnson CountyGreenfield——4.6 yrs58.3
Greenfield (JOPPA - WEST FRANKFORT)Greenfield230 kV300 MW3.8 yrs55.5
EC Coal Johnson CountyGreenfield——4.6 yrs54.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.