DC Readiness
57.5
Good / 100

EC Coal Edwards County is a greenfield datacenter candidate site in Edwards County, Illinois, interconnecting through PJM. It screens at 57.5/100 DC Readiness and a 4.6 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_COMED
Wholesale LMP$33.95/MWh
Utility commercial rate0.12¢/kWh
UtilityWAYNE-WHITE COUNTIES ELEC COOPcooperativemoderate to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 2.9 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionPJM
Queue depth393
Avg queue wait4.6 yrs
Recent queue wait2.9 yrs
Completion rate21%
Withdrawal rate79%

Connectivity

Nearest IXPSITCO Evansville
IXP distance36.4 mi
Fiber providers3
Fiber coverage59.1%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance245.8 mi

Site characteristics

Site typeGreenfield
Land contactEdwards County County Assessor
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops
Former usecoal adjacent

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score65/100
Construction cost index54.0 (avg 100)

Location context

Nearest datacenterSITCO Evansville
DC distance36.4 mi
Nearest rail2.5 mi
Nearest gas pipeline13.9 mi
Nearest fiber route153.3 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.75¢/kWh
Industrial electricity7.98¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$5,893

Regulatory climate

Restrictivestate posture · as of 2026-08

New-DC state tax exemptions suspended for 2 years (from Jul 2026).

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Coal Edwards County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
47
Fiber connectivity12%
64
Energy cost10%
93
Water risk7%
88
Natural hazard6%
65
Buildability7%
65
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
100
Gas pipeline2%
55
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in Edwards County, ranked by DC Readiness.

Sites near EC Coal Edwards County
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN122153Substation-Adjacent345 kV600 MW3.8 yrs62.5
OZ EdwardsGreenfield——4.6 yrs59.0
EC Coal Edwards CountyGreenfield——4.6 yrs56.5
Greenfield (UNKNOWN122153 - GIBSON STATION)Greenfield345 kV600 MW3.8 yrs56.2
EC FFE Edwards CountyGreenfield——4.6 yrs55.9
UNKNOWN169173Substation-Adjacent69 kV50 MW3.8 yrs54.5
UNKNOWN157812Substation-Adjacent69 kV50 MW3.8 yrs54.3
UNKNOWN122391Substation-Adjacent69 kV50 MW3.8 yrs54.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.