UNKNOWN201289

Substation-Adjacent

Boundary County, Idaho · WECC

DC Readiness
53.4
Fair / 100

UNKNOWN201289 is a substation-adjacent datacenter candidate site in Boundary County, Idaho, interconnecting through WECC. It screens at 53.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN201289
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityNORTHERN LIGHTS, INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPNeutron - Coeur d'Alene
IXP distance87.7 mi
Fiber providers4
Fiber coverage32.1%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterNeutron - Coeur d'Alene
DC distance87.7 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.32¢/kWh
Industrial electricity5.58¢/kWh
Cooling degree days500
Heating degree days6,400
Land price / acre$5,691

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Personal property tax exemption on computer equipment.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN201289

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
56
Fiber connectivity12%
47
Energy cost10%
50
Water risk7%
44
Natural hazard6%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Boundary County, ranked by DC Readiness.

Sites near UNKNOWN201289
SiteTypeVoltageCapacityQueue waitScore
EC FFE Boundary CountyGreenfield——2.0 yrs58.6
OZ BoundaryGreenfield——2.0 yrs58.2
TAP206878Substation-Adjacent138 kV100 MW6.9 yrs55.2
NORTH BENCHSubstation-Adjacent138 kV100 MW6.9 yrs55.0
TAP204956Substation-Adjacent115 kV100 MW6.9 yrs54.8
UNKNOWN203503Substation-Adjacent115 kV100 MW6.9 yrs54.8
UNKNOWN207654Substation-Adjacent115 kV100 MW6.9 yrs54.0
UNKNOWN206880Substation-Adjacent69 kV50 MW6.9 yrs52.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN201289, Boundary County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.