Benewah County, Idaho · WECC

DC Readiness
48.3
Fair / 100

SANDERS is a substation-adjacent datacenter candidate site in Benewah County, Idaho, interconnecting through WECC. It screens at 48.3/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSANDERS
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPCRALIDXX - Coeur d'Alene Central Office
IXP distance42.8 mi
Fiber providers4
Fiber coverage29.3%

Site characteristics

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenterTierPoint
DC distance43.0 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity10.26¢/kWh
Industrial electricity7.99¢/kWh
Cooling degree days500
Heating degree days6,400
Land price / acre$2,747

Incentive detail: Personal property tax exemption on computer equipment.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
42
Fiber connectivity12%
20
Energy cost10%
50
Water risk8%
44
Natural hazard8%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Benewah County, ranked by DC Readiness.

Sites near SANDERS
SiteTypeVoltageCapacityQueue waitScore
OZ BenewahGreenfield2.0 yrs57.5
EC FFE Benewah CountyGreenfield2.0 yrs57.3
TAP204924Substation-Adjacent230 kV300 MW6.9 yrs57.2
TAP206219Substation-Adjacent115 kV100 MW6.9 yrs53.2
PLUMMERSubstation-Adjacent115 kV100 MW6.9 yrs52.4
UNKNOWN207667Substation-Adjacent115 kV100 MW6.9 yrs51.9
TAP205377Substation-Adjacent115 kV100 MW6.9 yrs51.2
City of Plummer Pole YardIndustrial6.9 yrs50.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.