Vivian Walker Store Site is a industrial datacenter candidate site in Wilkes County, Georgia, interconnecting through SERC. It screens at 47.6/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSERC
Queue depth1

Connectivity

Nearest IXPColumbia County Community Broadband Utility
IXP distance37.6 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterColumbia County Community Broadband Utility
DC distance37.6 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.95¢/kWh
Industrial electricity8.00¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$3,614

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
74
Fiber connectivity12%
53
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Wilkes County, ranked by DC Readiness.

Sites near Vivian Walker Store Site
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN112371Substation-Adjacent115 kV100 MW3.7 yrs66.7
UNKNOWN112370Substation-Adjacent115 kV100 MW3.7 yrs64.3
UNKNOWN112374Substation-Adjacent115 kV100 MW3.7 yrs63.8
Greenfield (UNKNOWN112371 - UNKNOWN112374)Greenfield115 kV100 MW3.7 yrs59.2
Napa Block - Marathon Gas StationIndustrial47.6
Washington School Site ComplexIndustrial47.6
NAPA Block - Thornton Auto PartsIndustrial47.6
Anderson Service StationIndustrial47.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Vivian Walker Store Site, Wilkes County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.