Former Gas Station
IndustrialMuscogee County, Georgia · SERC
At a glance
Former Gas Station is an industrial datacenter candidate site in Muscogee County, Georgia, scoring 54.6/100 DC Readiness — 35th of 47 scored sites in the county. It sits in the SERC grid region and the GEORGIA POWER CO service territory, where interconnection has averaged 5.8 years from request to operation.
Power & interconnection
Speed to power
Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
Active incentives; Georgia Power courts large load with bring-your-own clean-energy options.
Georgia Power billing/contract rules apply to very large loads.
Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.
Site location
Get alerts
Track Former Gas Station
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Former Gas Station compare with other sites in Muscogee County?
Former Gas Station ranks 35th of 47 scored candidate sites in Muscogee County. Its 54.6/100 is roughly in line with the county average of 60.1. It is roughly in line with the Georgia average of 57.1 and roughly in line with the national average of 53.2.
Against the Georgia average, its strongest sub-score is fiber connectivity (87 vs 73) and its weakest is power availability (30 vs 50). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Former Gas Station to power, fiber and other datacenters?
For connectivity, the nearest internet exchange facility is DLI One at 6.4 miles. 10 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is DLI ONE, 6.3 miles away.
What are the flood, water and hazard risks at Former Gas Station?
At the county level, FEMA's National Risk Index rates Muscogee County "Relatively High".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Muscogee County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| FORTSON | Substation-Adjacent | 500 kV | 1,000 MW | 5.8 yrs | 69.1 |
| UNKNOWN109352 | Substation-Adjacent | 230 kV | 300 MW | 3.9 yrs | 65.1 |
| UNKNOWN113436 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 65.0 |
| UNKNOWN113439 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 64.9 |
| OZ Muscogee | Greenfield | — | — | 5.8 yrs | 64.6 |
| TAP142593 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 64.5 |
| UNKNOWN113548 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 64.3 |
| OZ Muscogee | Greenfield | — | — | 5.8 yrs | 64.2 |
Former Gas Station: common questions
What is the DC Readiness score of Former Gas Station?
Former Gas Station scores 54.6/100 on the GridCensus DC Readiness scale, rated fair. It ranks 35th of 47 scored sites in Muscogee County. The Muscogee County average is 60.1 and the Georgia average is 57.1.
Which electric utility serves Former Gas Station?
GEORGIA POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is SOUTHERN COMPANY.
What grid region is Former Gas Station in?
Former Gas Station is in the SERC region. Projects interconnecting there have averaged a 5.8-year wait from queue request to operation.
How far is Former Gas Station from an internet exchange?
The nearest internet exchange facility is DLI One, about 6.4 miles away; 10 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Former Gas Station, Muscogee County, GA”, https://gridcensus.com/datacenter-sites/georgia/muscogee-county/former-gas-station-d933f862 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Former Gas Station, Muscogee County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.