UNKNOWN112031

Substation-Adjacent

Montgomery County, Georgia · SERC

DC Readiness
64.4
Good / 100

UNKNOWN112031 is a substation-adjacent datacenter candidate site in Montgomery County, Georgia, interconnecting through SERC. It screens at 64.4/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN112031
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
UtilityGEORGIA POWER COinvestor ownedfavorable to large load · terms ≥ 100 MWPSC large-load rules (≥100 MW): direct-pay contracts · 15 yr

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPT5@Augusta
IXP distance84.6 mi
Fiber providers8
Fiber coverage94.1%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score60/100

Location context

Nearest datacenterT5@Augusta
DC distance84.6 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.52¢/kWh
Industrial electricity10.35¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$3,312

Regulatory climate

Favorablestate posture · as of 2026-08

Active incentives; Georgia Power courts large load with bring-your-own clean-energy options.

DC tax incentiveYes
Large-load threshold≥ 100 MW

Georgia Power billing/contract rules apply to very large loads.

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 6 nearby

Get alerts

Track UNKNOWN112031

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
75
Fiber connectivity12%
74
Energy cost10%
50
Water risk7%
80
Natural hazard6%
60
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
15

Nearby comparable sites

Other scored datacenter candidate sites in Montgomery County, ranked by DC Readiness.

Sites near UNKNOWN112031
SiteTypeVoltageCapacityQueue waitScore
TAP142446Substation-Adjacent115 kV100 MW1.0 yrs60.1
UNKNOWN112210Substation-Adjacent115 kV100 MW1.0 yrs60.1
TAP142435Substation-Adjacent115 kV100 MW1.0 yrs60.0
UNKNOWN112211Substation-Adjacent115 kV100 MW1.0 yrs59.9
Greenfield (UNKNOWN112211 - TAP169019)Greenfield115 kV100 MW1.0 yrs53.8
Mine SiteFormer Mine——3.8 yrs49.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN112031, Montgomery County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.