Harvey Commercial Site

Industrial

Grady County, Georgia · SERC

DC Readiness
55.9
Good / 100

Harvey Commercial Site is an industrial datacenter candidate site in Grady County, Georgia, interconnecting through SERC. It screens at 55.9/100 DC Readiness and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPEdgeConneX Tallahassee (EDCTAL01)
IXP distance29.2 mi
Fiber providers8
Fiber coverage92.7%

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score60/100

Location context

Nearest datacenterEdgeConneX Tallahassee (EDCTAL01)
DC distance29.2 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.18¢/kWh
Industrial electricity14.07¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$3,955

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
75
Fiber connectivity12%
76
Energy cost10%
50
Water risk8%
80
Natural hazard8%
60
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
15

Nearby comparable sites

Other scored datacenter candidate sites in Grady County, ranked by DC Readiness.

Sites near Harvey Commercial Site
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN111600Substation-Adjacent115 kV100 MW1.0 yrs60.2
UNKNOWN111598Substation-Adjacent115 kV100 MW1.0 yrs58.9
TAP143126Substation-Adjacent115 kV100 MW1.0 yrs58.8
TAP161824Substation-Adjacent115 kV100 MW1.0 yrs58.4
UNKNOWN111601Substation-Adjacent115 kV100 MW1.0 yrs58.4
UNKNOWN111602Substation-Adjacent115 kV100 MW1.0 yrs58.2
UNKNOWN111599Substation-Adjacent115 kV100 MW1.0 yrs58.1
TAP143132Substation-Adjacent115 kV100 MW1.0 yrs57.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Harvey Commercial Site, Grady County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.