Multiple Addresses-0 Murphy Avenue
IndustrialFulton County, Georgia · SERC
At a glance
Multiple Addresses-0 Murphy Avenue is an industrial datacenter candidate site in Fulton County, Georgia, scoring 56.7/100 DC Readiness — 66th of 202 scored sites in the county. It sits in the SERC grid region and the GEORGIA POWER CO service territory, where interconnection has averaged 5.8 years from request to operation.
Power & interconnection
Speed to power
Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
Active incentives; Georgia Power courts large load with bring-your-own clean-energy options.
Georgia Power billing/contract rules apply to very large loads.
Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.
Site location
Get alerts
Track Multiple Addresses-0 Murphy Avenue
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Multiple Addresses-0 Murphy Avenue compare with other sites in Fulton County?
Multiple Addresses-0 Murphy Avenue ranks 66th of 202 scored candidate sites in Fulton County. Its 56.7/100 is roughly in line with the county average of 58.8. It is roughly in line with the Georgia average of 57.1 and roughly in line with the national average of 53.2.
Against the Georgia average, its strongest sub-score is fiber connectivity (97 vs 73) and its weakest is power availability (30 vs 50). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Multiple Addresses-0 Murphy Avenue to power, fiber and other datacenters?
For connectivity, the nearest internet exchange facility is Verizon Atlanta at 0.2 miles. 16 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Cogent Atlanta 2, 0.3 miles away.
What are the flood, water and hazard risks at Multiple Addresses-0 Murphy Avenue?
At the county level, FEMA's National Risk Index rates Fulton County "Relatively High".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Fulton County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN111549 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 70.3 |
| UNKNOWN111552 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 67.0 |
| UNKNOWN172426 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 67.0 |
| UNKNOWN111533 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 67.0 |
| UNKNOWN111356 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 66.9 |
| UNKNOWN111355 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 66.9 |
| BOULEVARD | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 66.9 |
| UNKNOWN111357 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 66.9 |
Multiple Addresses-0 Murphy Avenue: common questions
What is the DC Readiness score of Multiple Addresses-0 Murphy Avenue?
Multiple Addresses-0 Murphy Avenue scores 56.7/100 on the GridCensus DC Readiness scale, rated good. It ranks 66th of 202 scored sites in Fulton County. The Fulton County average is 58.8 and the Georgia average is 57.1.
Which electric utility serves Multiple Addresses-0 Murphy Avenue?
GEORGIA POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is SOUTHERN COMPANY.
What grid region is Multiple Addresses-0 Murphy Avenue in?
Multiple Addresses-0 Murphy Avenue is in the SERC region. Projects interconnecting there have averaged a 5.8-year wait from queue request to operation.
How far is Multiple Addresses-0 Murphy Avenue from an internet exchange?
The nearest internet exchange facility is Verizon Atlanta, about 0.2 miles away; 16 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Multiple Addresses-0 Murphy Avenue, Fulton County, GA”, https://gridcensus.com/datacenter-sites/georgia/fulton-county/multiple-addresses-0-murphy-avenue-ac5667cc (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Multiple Addresses-0 Murphy Avenue, Fulton County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.