Mine Site

Former Mine

Floyd County, Georgia · SERC

DC Readiness
48.4
Fair / 100

Mine Site is a former mine datacenter candidate site in Floyd County, Georgia, interconnecting through SERC. It screens at 48.4/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSERC
Queue depth1

Connectivity

Nearest IXPPhoenixNAP ATLANTA
IXP distance43.9 mi

Site characteristics

Site typeFormer Mine
Former useMining: Stone; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterDatacenter 00545704217
DC distance29.6 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.15¢/kWh
Industrial electricity7.13¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$5,568

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
74
Fiber connectivity12%
53
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Floyd County, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN110629Substation-Adjacent230 kV300 MW3.7 yrs69.4
UNKNOWN110617Substation-Adjacent230 kV300 MW3.7 yrs68.7
HAMMOND STATIONSubstation-Adjacent230 kV300 MW3.7 yrs68.0
TAP160990Substation-Adjacent115 kV100 MW3.7 yrs67.3
ROCKY MOUNTAIN HYDROELECTRIC PLANTSubstation-Adjacent230 kV300 MW3.7 yrs67.3
TAP160991Substation-Adjacent115 kV100 MW3.7 yrs67.3
TAP160972Substation-Adjacent115 kV100 MW3.7 yrs67.2
UNKNOWN110621Substation-Adjacent115 kV100 MW3.7 yrs66.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.