Curtis Packing
IndustrialFloyd County, Georgia · SERC
At a glance
Curtis Packing is an industrial datacenter candidate site in Floyd County, Georgia, scoring 50.4/100 DC Readiness — 47th of 51 scored sites in the county. It sits in the SERC grid region and the GEORGIA POWER CO service territory, where interconnection has averaged 5.8 years from request to operation.
Power & interconnection
Speed to power
Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
Active incentives; Georgia Power courts large load with bring-your-own clean-energy options.
Georgia Power billing/contract rules apply to very large loads.
Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.
Site location
Get alerts
Track Curtis Packing
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Curtis Packing compare with other sites in Floyd County?
Curtis Packing ranks 47th of 51 scored candidate sites in Floyd County. Its 50.4/100 is roughly in line with the county average of 55.3. It is about 12% below the Georgia average of 57.1 and roughly in line with the national average of 53.2.
Against the Georgia average, its strongest sub-score is natural hazard (60 vs 59) and its weakest is power availability (30 vs 50). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Curtis Packing to power, fiber and other datacenters?
For connectivity, the nearest internet exchange facility is PhoenixNAP ATLANTA at 45.7 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Datacenter 00545704217, 31.5 miles away.
What are the flood, water and hazard risks at Curtis Packing?
At the county level, FEMA's National Risk Index rates Floyd County "Relatively High".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Floyd County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| HAMMOND STATION | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 64.4 |
| UNKNOWN110617 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 61.6 |
| UNKNOWN110629 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 60.6 |
| UNKNOWN110614 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 60.5 |
| EC Near Hammond | Greenfield | — | — | 5.8 yrs | 58.5 |
| TAP160971 | Substation-Adjacent | 115 kV | 100 MW | 5.8 yrs | 57.2 |
| UNKNOWN110631 | Substation-Adjacent | 115 kV | 100 MW | 5.8 yrs | 57.2 |
| TAP160991 | Substation-Adjacent | 115 kV | 100 MW | 5.8 yrs | 57.2 |
Curtis Packing: common questions
What is the DC Readiness score of Curtis Packing?
Curtis Packing scores 50.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 47th of 51 scored sites in Floyd County. The Floyd County average is 55.3 and the Georgia average is 57.1.
Which electric utility serves Curtis Packing?
GEORGIA POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is SOUTHERN COMPANY.
What grid region is Curtis Packing in?
Curtis Packing is in the SERC region. Projects interconnecting there have averaged a 5.8-year wait from queue request to operation.
How far is Curtis Packing from an internet exchange?
The nearest internet exchange facility is PhoenixNAP ATLANTA, about 45.7 miles away; 5 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Curtis Packing, Floyd County, GA”, https://gridcensus.com/datacenter-sites/georgia/floyd-county/curtis-packing-43cc49c8 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Curtis Packing, Floyd County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.