UNKNOWN116816
Substation-AdjacentBaldwin, Georgia · SERC
UNKNOWN116816 is a substation-adjacent datacenter candidate site in Baldwin, Georgia, interconnecting through SERC. It screens at 60.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Shorter queues and healthier completion here — a faster path to energization than the national norm.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
Active incentives; Georgia Power courts large load with bring-your-own clean-energy options.
Georgia Power billing/contract rules apply to very large loads.
Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.
Site location
Get alerts
Track UNKNOWN116816
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Baldwin, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN113535 | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 64.9 |
| OZ Baldwin | Greenfield | — | — | 5.8 yrs | 60.8 |
| UNKNOWN116819 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 60.6 |
| UNKNOWN113534 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 60.6 |
| UNKNOWN113533 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 60.6 |
| UNKNOWN113536 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 60.6 |
| UNKNOWN113532 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 60.5 |
| UNKNOWN116820 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 60.5 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.