Skip to content
Gridcensus

Posey's on the River Sites

Industrial

Wakulla County, Florida · SERC

DC Readiness
47.2
Fair / 100

At a glance

Posey's on the River Sites is an industrial datacenter candidate site in Wakulla County, Florida, scoring 47.2/100 DC Readiness — 27th of 28 scored sites in the county. It sits in the SERC grid region and the DUKE ENERGY FLORIDA, LLC service territory, where interconnection has averaged 3.7 years from request to operation.

Power & interconnection

UtilityDUKE ENERGY FLORIDA, LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 4.6 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait4.6 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPEdgeConneX Tallahassee (EDCTAL01)
IXP distance23.7 mi
Fiber providers5
Fiber coverage3.2%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterEdgeConneX Tallahassee (EDCTAL01)
DC distance23.7 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.94¢/kWh
Industrial electricity9.00¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$9,146

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Posey's on the River Sites

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Posey's on the River Sites compare with other sites in Wakulla County?

Posey's on the River Sites ranks 27th of 28 scored candidate sites in Wakulla County. Its 47.2/100 is roughly in line with the county average of 50.9. It is about 16% below the Florida average of 56.0 and about 11% below the national average of 53.2.

Against the Florida average, its strongest sub-score is natural hazard (45 vs 43) and its weakest is fiber connectivity (28 vs 73). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Posey's on the River Sites to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is EdgeConneX Tallahassee (EDCTAL01) at 23.7 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is EdgeConneX Tallahassee (EDCTAL01), 23.7 miles away.

What are the flood, water and hazard risks at Posey's on the River Sites?

At the county level, FEMA's National Risk Index rates Wakulla County "Very High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
65
Fiber connectivity12%
28
Energy cost10%
50
Water risk7%
76
Natural hazard6%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Wakulla County, ranked by DC Readiness.

Sites near Posey's on the River Sites
SiteTypeVoltageCapacityQueue waitScore
CRAWFORDVILLESubstation-Adjacent230 kV300 MW3.7 yrs60.0
UNKNOWN120758Substation-Adjacent230 kV300 MW3.7 yrs59.8
UNKNOWN120739Substation-Adjacent230 kV300 MW3.7 yrs57.8
EC Near S O PurdomGreenfield——3.7 yrs54.5
EC Near S O PurdomGreenfield——3.7 yrs53.9
EC Near S O PurdomGreenfield——3.7 yrs53.7
UNKNOWN120757Substation-Adjacent115 kV100 MW3.7 yrs53.6
EC Near S O PurdomGreenfield——3.7 yrs51.6

Posey's on the River Sites: common questions

What is the DC Readiness score of Posey's on the River Sites?

Posey's on the River Sites scores 47.2/100 on the GridCensus DC Readiness scale, rated fair. It ranks 27th of 28 scored sites in Wakulla County. The Wakulla County average is 50.9 and the Florida average is 56.0.

Which electric utility serves Posey's on the River Sites?

DUKE ENERGY FLORIDA, LLC (investor owned) holds the retail service territory that contains the site; its holding company is DUKE ENERGY CORP.

What grid region is Posey's on the River Sites in?

Posey's on the River Sites is in the SERC region. Projects interconnecting there have averaged a 3.7-year wait from queue request to operation.

How far is Posey's on the River Sites from an internet exchange?

The nearest internet exchange facility is EdgeConneX Tallahassee (EDCTAL01), about 23.7 miles away; 5 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Posey's on the River Sites, Wakulla County, FL”, https://gridcensus.com/datacenter-sites/florida/wakulla-county/posey-s-on-the-river-sites-424435ea (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Posey's on the River Sites, Wakulla County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.