EC Near S O Purdom

Greenfield

Wakulla County, Florida · SERC

DC Readiness
49.0
Fair / 100

EC Near S O Purdom is a greenfield datacenter candidate site in Wakulla County, Florida, interconnecting through SERC. It screens at 49.0/100 DC Readiness and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPEdgeConneX Tallahassee (EDCTAL01)
IXP distance26.3 mi
Fiber providers9
Fiber coverage50.0%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance318.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerUnited States Of America
Land owner typeprivate
Buildability15.0/100
Land cover (NLCD)Woody Wetlands
Former usenear retired gas plant (10km)

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)1.20
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score20/100
Construction cost index86.5 (avg 100)

Location context

Nearest datacenterEdgeConneX Tallahassee (EDCTAL01)
DC distance26.3 mi
Nearest rail20.3 mi
Nearest gas pipeline10.9 mi
Nearest fiber route105.2 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.94¢/kWh
Industrial electricity9.00¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$9,146

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
75
Fiber connectivity12%
23
Energy cost10%
89
Water risk8%
77
Natural hazard8%
20
Buildability7%
15
Labor market4%
50
DC cluster4%
60
Land / acreage3%
40
Construction cost3%
78
Gas pipeline2%
65
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Wakulla County, ranked by DC Readiness.

Sites near EC Near S O Purdom
SiteTypeVoltageCapacityQueue waitScore
CRAWFORDVILLESubstation-Adjacent230 kV300 MW5.8 yrs69.5
UNKNOWN162155Substation-Adjacent230 kV300 MW3.6 yrs66.8
TAP143305Substation-Adjacent115 kV100 MW3.6 yrs66.6
CRAWFORDVILLESubstation-Adjacent230 kV300 MW3.6 yrs64.9
Greenfield (UNKNOWN120758 - UNKNOWN120760)Greenfield230 kV300 MW3.6 yrs61.0
Greenfield (CRAWFORDVILLE - UNKNOWN162155)Greenfield230 kV300 MW3.6 yrs60.0
Greenfield (UNKNOWN120739 - CRAWFORDVILLE)Greenfield230 kV300 MW3.6 yrs59.6
S O PurdomBrownfield80 MW3.6 yrs56.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near S O Purdom, Wakulla County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.