Skip to content
Gridcensus

Greenfield (TAP142389 - TAP143310)

Greenfield

Taylor County, Florida · SERC

DC Readiness
51.6
Fair / 100

Greenfield (TAP142389 - TAP143310) is a greenfield datacenter candidate site in Taylor County, Florida, interconnecting through SERC. It screens at 51.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP142389
Substation voltage115 kV
Available capacity100 MW
UtilityDUKE ENERGY FLORIDA, LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPEdgeConneX Tallahassee (EDCTAL01)
IXP distance46.4 mi
Fiber providers3
Fiber coverage60.2%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterEdgeConneX Tallahassee (EDCTAL01)
DC distance46.4 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.49¢/kWh
Industrial electricity8.26¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$4,478

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 6 nearby

Get alerts

Track Greenfield (TAP142389 - TAP143310)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power20%
73
Fiber connectivity12%
61
Energy cost10%
50
Water risk7%
76
Natural hazard6%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Taylor County, ranked by DC Readiness.

Sites near Greenfield (TAP142389 - TAP143310)
SiteTypeVoltageCapacityQueue waitScore
PERRYSubstation-Adjacent230 kV300 MW1.0 yrs62.7
UNKNOWN120760Substation-Adjacent230 kV300 MW1.0 yrs62.6
TAP142389Substation-Adjacent115 kV100 MW1.0 yrs58.1
UNKNOWN107668Substation-Adjacent69 kV50 MW1.0 yrs56.4
UNKNOWN107669Substation-Adjacent69 kV50 MW1.0 yrs56.4
Mine SiteFormer Mine——1.0 yrs48.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (TAP142389 - TAP143310), Taylor County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.