Urbaculture/Learning Center

Industrial

Sarasota County, Florida · SERC

DC Readiness
46.5
Fair / 100

At a glance

Urbaculture/Learning Center is an industrial datacenter candidate site in Sarasota County, Florida, scoring 46.5/100 DC Readiness — 29th of 30 scored sites in the county. It sits in the SERC grid region and the FLORIDA POWER & LIGHT CO service territory, where interconnection has averaged 3.7 years from request to operation.

Power & interconnection

UtilityFLORIDA POWER & LIGHT COinvestor ownedfavorable to large load · terms ≥ 50 MWLarge Load Contract Service (LLCS, ≥50 MW) · 90% min take · 20 yr

Speed to power

Interconnection outlookModerate
≈ 4.6 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait4.6 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPWOW! Business (Tampa Datacenter)
IXP distance40.9 mi
Fiber providers9
Fiber coverage82.6%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterCyrusOne Tampa
DC distance41.0 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.92¢/kWh
Industrial electricity9.18¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$12,958

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Urbaculture/Learning Center

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Urbaculture/Learning Center compare with other sites in Sarasota County?

Urbaculture/Learning Center ranks 29th of 30 scored candidate sites in Sarasota County. Its 46.5/100 is about 15% below the county average of 55.0. It is about 17% below the Florida average of 56.0 and about 13% below the national average of 53.2.

Against the Florida average, its strongest sub-score is natural hazard (45 vs 43) and its weakest is fiber connectivity (28 vs 73). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Urbaculture/Learning Center to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is WOW! Business (Tampa Datacenter) at 40.9 miles. 9 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is CyrusOne Tampa, 41 miles away.

What are the flood, water and hazard risks at Urbaculture/Learning Center?

At the county level, FEMA's National Risk Index rates Sarasota County "Very High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
65
Fiber connectivity12%
28
Energy cost10%
50
Water risk7%
76
Natural hazard6%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Sarasota County, ranked by DC Readiness.

Sites near Urbaculture/Learning Center
SiteTypeVoltageCapacityQueue waitScore
BENEVASubstation-Adjacent230 kV300 MW3.7 yrs62.1
TAP143096Substation-Adjacent230 kV300 MW3.7 yrs62.0
INTERSTATESubstation-Adjacent230 kV300 MW3.7 yrs62.0
UNKNOWN108468Substation-Adjacent230 kV300 MW3.7 yrs61.9
PHILLIPPISubstation-Adjacent230 kV300 MW3.7 yrs61.9
SAWGRASSSubstation-Adjacent230 kV300 MW3.7 yrs61.9
OZ SarasotaGreenfield——3.7 yrs61.8
LAURELWOODSubstation-Adjacent230 kV300 MW3.7 yrs61.8

Urbaculture/Learning Center: common questions

What is the DC Readiness score of Urbaculture/Learning Center?

Urbaculture/Learning Center scores 46.5/100 on the GridCensus DC Readiness scale, rated fair. It ranks 29th of 30 scored sites in Sarasota County. The Sarasota County average is 55.0 and the Florida average is 56.0.

Which electric utility serves Urbaculture/Learning Center?

FLORIDA POWER & LIGHT CO (investor owned) holds the retail service territory that contains the site; its holding company is NEXTERA ENERGY INC.

What grid region is Urbaculture/Learning Center in?

Urbaculture/Learning Center is in the SERC region. Projects interconnecting there have averaged a 3.7-year wait from queue request to operation.

How far is Urbaculture/Learning Center from an internet exchange?

The nearest internet exchange facility is WOW! Business (Tampa Datacenter), about 40.9 miles away; 9 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Urbaculture/Learning Center, Sarasota County, FL”, https://gridcensus.com/datacenter-sites/florida/sarasota-county/urbaculture-learning-center-d87e2200 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Urbaculture/Learning Center, Sarasota County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.