Skip to content
Gridcensus

EC Near C D McIntosh Jr

Greenfield

Polk County, Florida · SERC

DC Readiness
59.2
Good / 100

EC Near C D McIntosh Jr is a greenfield datacenter candidate site in Polk County, Florida, interconnecting through SERC. It screens at 59.2/100 DC Readiness and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.11¢/kWh
UtilityDUKE ENERGY FLORIDA, LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPLawton Information Services, LLC
IXP distance4.4 mi
Fiber providers12
Fiber coverage59.6%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance376.7 mi

Site characteristics

Site typeGreenfield
Parcel ownerCsx Corporation
Land contactPolk County Assessor
Land owner typeprivate
Buildability0.0/100
Land cover (NLCD)Woody Wetlands
Former usenear retired coal plant (10km)

Risk & environment

Environmental constraintModerate (55/100)
Flood zoneZone A (SFHA)
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteMARK 1 INDUSTRIAL REFINISHING
Hazard sub-score20/100
Construction cost index86.5 (avg 100)

Location context

Nearest datacenterLawton Information Services, LLC
DC distance4.4 mi
Nearest rail0.3 mi
Nearest gas pipeline0.0 mi
Nearest fiber route7.8 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.13¢/kWh
Industrial electricity9.75¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$7,140

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near C D McIntosh Jr

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
74
Fiber connectivity12%
88
Energy cost10%
89
Water risk7%
83
Natural hazard6%
20
Buildability7%
0
Labor market4%
50
DC cluster4%
80
Land / acreage3%
48
Construction cost3%
78
Gas pipeline2%
100
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Polk County, ranked by DC Readiness.

Sites near EC Near C D McIntosh Jr
SiteTypeVoltageCapacityQueue waitScore
KATHLEENSubstation-Adjacent500 kV1,000 MW1.0 yrs70.5
UNKNOWN120314Substation-Adjacent230 kV300 MW1.0 yrs69.4
UNKNOWN108701Substation-Adjacent230 kV300 MW1.0 yrs68.4
UNKNOWN120320Substation-Adjacent230 kV300 MW1.0 yrs68.3
SOUTH ELOISESubstation-Adjacent230 kV300 MW1.0 yrs68.1
OZ PolkGreenfield——3.6 yrs67.9
WESTSubstation-Adjacent230 kV300 MW1.0 yrs67.2
EC Near Larsen MemorialGreenfield——3.6 yrs67.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near C D McIntosh Jr, Polk County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.