Pine Hills Bike Path-Section 2
IndustrialOrange County, Florida · SERC
At a glance
Pine Hills Bike Path-Section 2 is an industrial datacenter candidate site in Orange County, Florida, scoring 55.4/100 DC Readiness — 137th of 163 scored sites in the county. It sits in the SERC grid region and the DUKE ENERGY FLORIDA, LLC service territory, where interconnection has averaged 3.7 years from request to operation.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.
Site location
Get alerts
Track Pine Hills Bike Path-Section 2
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Pine Hills Bike Path-Section 2 compare with other sites in Orange County?
Pine Hills Bike Path-Section 2 ranks 137th of 163 scored candidate sites in Orange County. Its 55.4/100 is roughly in line with the county average of 60.1. It is roughly in line with the Florida average of 56.0 and roughly in line with the national average of 53.2.
Against the Florida average, its strongest sub-score is fiber connectivity (90 vs 73) and its weakest is power availability (30 vs 41). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Pine Hills Bike Path-Section 2 to power, fiber and other datacenters?
For connectivity, the nearest internet exchange facility is HostDime Orlando Tier IV Data Center at 3.5 miles. 20 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Datacenter 00609126465, 4 miles away.
What are the flood, water and hazard risks at Pine Hills Bike Path-Section 2?
At the county level, FEMA's National Risk Index rates Orange County "Very High".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Orange County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| SKY LAKE | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 66.9 |
| UNKNOWN120236 | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 66.8 |
| CONVENTION CENTER | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 66.8 |
| RISER143336 | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 66.6 |
| STANTON | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 66.4 |
| ALTAMONTE SPRINGS | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 66.0 |
| MEADOW WOODS SOUTH | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 66.0 |
| UNKNOWN120225 | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 66.0 |
Pine Hills Bike Path-Section 2: common questions
What is the DC Readiness score of Pine Hills Bike Path-Section 2?
Pine Hills Bike Path-Section 2 scores 55.4/100 on the GridCensus DC Readiness scale, rated good. It ranks 137th of 163 scored sites in Orange County. The Orange County average is 60.1 and the Florida average is 56.0.
Which electric utility serves Pine Hills Bike Path-Section 2?
DUKE ENERGY FLORIDA, LLC (investor owned) holds the retail service territory that contains the site; its holding company is DUKE ENERGY CORP.
What grid region is Pine Hills Bike Path-Section 2 in?
Pine Hills Bike Path-Section 2 is in the SERC region. Projects interconnecting there have averaged a 3.7-year wait from queue request to operation.
How far is Pine Hills Bike Path-Section 2 from an internet exchange?
The nearest internet exchange facility is HostDime Orlando Tier IV Data Center, about 3.5 miles away; 20 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Pine Hills Bike Path-Section 2, Orange County, FL”, https://gridcensus.com/datacenter-sites/florida/orange-county/pine-hills-bike-path-section-2-64823b16 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Pine Hills Bike Path-Section 2, Orange County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.