Skip to content
Gridcensus

Pine Hills Bike Path-Section 2

Industrial

Orange County, Florida · SERC

DC Readiness
55.4
Good / 100

At a glance

Pine Hills Bike Path-Section 2 is an industrial datacenter candidate site in Orange County, Florida, scoring 55.4/100 DC Readiness — 137th of 163 scored sites in the county. It sits in the SERC grid region and the DUKE ENERGY FLORIDA, LLC service territory, where interconnection has averaged 3.7 years from request to operation.

Power & interconnection

UtilityDUKE ENERGY FLORIDA, LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 4.6 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait4.6 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPHostDime Orlando Tier IV Data Center
IXP distance3.5 mi
Fiber providers20
Fiber coverage71.0%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterDatacenter 00609126465
DC distance4.0 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.20¢/kWh
Industrial electricity9.41¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$10,106

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Pine Hills Bike Path-Section 2

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Pine Hills Bike Path-Section 2 compare with other sites in Orange County?

Pine Hills Bike Path-Section 2 ranks 137th of 163 scored candidate sites in Orange County. Its 55.4/100 is roughly in line with the county average of 60.1. It is roughly in line with the Florida average of 56.0 and roughly in line with the national average of 53.2.

Against the Florida average, its strongest sub-score is fiber connectivity (90 vs 73) and its weakest is power availability (30 vs 41). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Pine Hills Bike Path-Section 2 to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is HostDime Orlando Tier IV Data Center at 3.5 miles. 20 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Datacenter 00609126465, 4 miles away.

What are the flood, water and hazard risks at Pine Hills Bike Path-Section 2?

At the county level, FEMA's National Risk Index rates Orange County "Very High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
65
Fiber connectivity12%
90
Energy cost10%
50
Water risk7%
76
Natural hazard6%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Orange County, ranked by DC Readiness.

Sites near Pine Hills Bike Path-Section 2
SiteTypeVoltageCapacityQueue waitScore
SKY LAKESubstation-Adjacent230 kV300 MW3.7 yrs66.9
UNKNOWN120236Substation-Adjacent230 kV300 MW3.7 yrs66.8
CONVENTION CENTERSubstation-Adjacent230 kV300 MW3.7 yrs66.8
RISER143336Substation-Adjacent230 kV300 MW3.7 yrs66.6
STANTONSubstation-Adjacent230 kV300 MW3.7 yrs66.4
ALTAMONTE SPRINGSSubstation-Adjacent230 kV300 MW3.7 yrs66.0
MEADOW WOODS SOUTHSubstation-Adjacent230 kV300 MW3.7 yrs66.0
UNKNOWN120225Substation-Adjacent230 kV300 MW3.7 yrs66.0

Pine Hills Bike Path-Section 2: common questions

What is the DC Readiness score of Pine Hills Bike Path-Section 2?

Pine Hills Bike Path-Section 2 scores 55.4/100 on the GridCensus DC Readiness scale, rated good. It ranks 137th of 163 scored sites in Orange County. The Orange County average is 60.1 and the Florida average is 56.0.

Which electric utility serves Pine Hills Bike Path-Section 2?

DUKE ENERGY FLORIDA, LLC (investor owned) holds the retail service territory that contains the site; its holding company is DUKE ENERGY CORP.

What grid region is Pine Hills Bike Path-Section 2 in?

Pine Hills Bike Path-Section 2 is in the SERC region. Projects interconnecting there have averaged a 3.7-year wait from queue request to operation.

How far is Pine Hills Bike Path-Section 2 from an internet exchange?

The nearest internet exchange facility is HostDime Orlando Tier IV Data Center, about 3.5 miles away; 20 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Pine Hills Bike Path-Section 2, Orange County, FL”, https://gridcensus.com/datacenter-sites/florida/orange-county/pine-hills-bike-path-section-2-64823b16 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Pine Hills Bike Path-Section 2, Orange County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.