Kenneth P. Ksionek Community Solar Farm at the Stanton Energy Center (SEC)

Brownfield

Orange County, Florida · SERC

DC Readiness
64.5
Good / 100

Kenneth P. Ksionek Community Solar Farm at the Stanton Energy Center (SEC) is a brownfield datacenter candidate site in Orange County, Florida, interconnecting through SERC. It screens at 64.5/100 DC Readiness with a catalogued 13 MW of candidate capacity.

Power & interconnection

Substation distance1.4 mi
Available capacity13 MW
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1

Connectivity

Nearest IXPColo Solutions Downtown Orlando
IXP distance6.0 mi
Fiber providers21
Nearest cloud providerGoogle
Nearest cloud regionus-east1
Cloud region distance335.5 mi

Site characteristics

Site typeBrownfield
Acreage24 ac
Land owner typeprivate
Buildability75.0/100
Former uselandfill
Existing capacity13 MW
Cleanup statuscleanup_complete

Risk & environment

Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyPresent
Superfund siteWORLD CHEVY GEO
Hazard sub-score25/100
Construction cost index95.6 (avg 100)

Location context

Nearest datacenterColo Solutions Downtown Orlando
DC distance6.0 mi
Nearest rail2.8 mi
Nearest gas pipeline2.4 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.20¢/kWh
Industrial electricity9.41¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$10,106

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
43
Speed to power15%
63
Fiber connectivity12%
89
Energy cost10%
96
Water risk8%
83
Natural hazard8%
25
Buildability7%
75
Labor market4%
50
DC cluster4%
80
Land / acreage3%
40
Construction cost3%
70
Gas pipeline2%
92
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Orange County, ranked by DC Readiness.

Sites near Kenneth P. Ksionek Community Solar Farm at the Stanton Energy Center (SEC)
SiteTypeVoltageCapacityQueue waitScore
DEADEND167102Substation-Adjacent230 kV300 MW3.6 yrs76.0
WINDERMERESubstation-Adjacent230 kV300 MW3.6 yrs75.9
UNKNOWN120236Substation-Adjacent230 kV300 MW3.6 yrs75.9
CONVENTION CENTERSubstation-Adjacent230 kV300 MW3.6 yrs75.8
UNKNOWN120234Substation-Adjacent230 kV300 MW3.6 yrs75.1
TAFTSubstation-Adjacent230 kV300 MW3.6 yrs74.9
INTERNATIONAL DRIVESubstation-Adjacent230 kV300 MW3.6 yrs74.8
STANTONSubstation-Adjacent230 kV300 MW3.6 yrs74.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Kenneth P. Ksionek Community Solar Farm at the Stanton Energy Center (SEC), Orange County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.