Mine Site

Former Mine

Levy County, Florida · PJM

DC Readiness
46.1
Fair / 100

Mine Site is a former mine datacenter candidate site in Levy County, Florida, interconnecting through PJM. It screens at 46.1/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityDUKE ENERGY FLORIDA, LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPSmart City Telecom Maitland Colo
IXP distance77.5 mi
Fiber providers8
Fiber coverage74.1%

Site characteristics

Site typeFormer Mine
Former useMining: Coal; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterUF Research Computing Center
DC distance31.4 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.36¢/kWh
Industrial electricity8.90¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$6,275

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Mine Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
39
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
76
Natural hazard6%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Levy County, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
BRONSONSubstation-Adjacent230 kV300 MW1.0 yrs63.4
OZ LevyGreenfield——3.6 yrs60.1
EC Coal Levy CountyGreenfield——3.6 yrs57.4
UNKNOWN154652Substation-Adjacent69 kV50 MW1.0 yrs57.0
TAP154671Substation-Adjacent69 kV50 MW1.0 yrs57.0
UNKNOWN120450Substation-Adjacent69 kV50 MW1.0 yrs56.8
UNKNOWN108156Substation-Adjacent69 kV50 MW1.0 yrs56.7
TAP154672Substation-Adjacent69 kV50 MW1.0 yrs56.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, Levy County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.