ANA Groves Site
IndustrialHendry County, Florida · SERC
ANA Groves Site is an industrial datacenter candidate site in Hendry County, Florida, interconnecting through SERC. It screens at 50.4/100 DC Readiness and a 1.0 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Risk & environment
Location context
Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Hendry County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| TAP172423 | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 54.0 |
| IMMOKALEE NO. 4 | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 53.8 |
| UNKNOWN150323 | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 52.4 |
| MCCARTHY | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 52.4 |
| UNKNOWN108515 | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 52.4 |
| JOHN DRAKE | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 52.4 |
| SRF Pulp Processing Facility | Brownfield | — | 20 MW | 3.6 yrs | 51.4 |
| CITY OF CLEWISTON | Substation-Adjacent | 138 kV | 100 MW | 1.0 yrs | 51.2 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for ANA Groves Site, Hendry County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.