IMMOKALEE NO. 4

Substation-Adjacent

Hendry County, Florida · SERC

DC Readiness
53.8
Fair / 100

IMMOKALEE NO. 4 is a substation-adjacent datacenter candidate site in Hendry County, Florida, interconnecting through SERC. It screens at 53.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationIMMOKALEE NO. 4
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPSKYLINK DATA CENTERS
IXP distance28.5 mi
Fiber providers7
Fiber coverage23.1%

Site characteristics

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score45/100

Location context

Nearest datacenterSKYLINK DATA CENTERS
DC distance28.5 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity15.01¢/kWh
Industrial electricity11.85¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$4,646

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
75
Fiber connectivity12%
23
Energy cost10%
50
Water risk8%
76
Natural hazard8%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Hendry County, ranked by DC Readiness.

Sites near IMMOKALEE NO. 4
SiteTypeVoltageCapacityQueue waitScore
TAP172423Substation-Adjacent138 kV100 MW1.0 yrs54.0
MCCARTHYSubstation-Adjacent138 kV100 MW1.0 yrs52.4
UNKNOWN108515Substation-Adjacent138 kV100 MW1.0 yrs52.4
JOHN DRAKESubstation-Adjacent138 kV100 MW1.0 yrs52.4
UNKNOWN150323Substation-Adjacent138 kV100 MW1.0 yrs52.4
SRF Pulp Processing FacilityBrownfield20 MW3.6 yrs51.4
CITY OF CLEWISTONSubstation-Adjacent138 kV100 MW1.0 yrs51.2
Harlem AcademyIndustrial1.0 yrs50.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for IMMOKALEE NO. 4, Hendry County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.