DC Readiness
53.9
Fair / 100

OZ Baker is a greenfield datacenter candidate site in Baker County, Florida, interconnecting through SERC. It screens at 53.9/100 DC Readiness and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.12¢/kWh
UtilityFLORIDA POWER & LIGHT COinvestor ownedfavorable to large load · terms ≥ 50 MWLarge Load Contract Service (LLCS, ≥50 MW) · 90% min take · 20 yr

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPCologix JAX1
IXP distance40.6 mi
Fiber providers3
Fiber coverage26.3%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance238.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerU S Land
Land contactBaker County Assessor
Land owner typeprivate
Buildability15.0/100
Land cover (NLCD)Woody Wetlands

Risk & environment

Environmental constraintModerate (40/100)
Flood zoneZone A (SFHA)
Water stress (WRI)1.20
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score20/100
Construction cost index67.7 (avg 100)

Location context

Nearest datacenterCologix Jacksonville JAX1
DC distance40.6 mi
Nearest rail9.2 mi
Nearest gas pipeline4.1 mi
Nearest fiber route116.1 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.99¢/kWh
Industrial electricity7.61¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$8,182

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Baker

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
74
Fiber connectivity12%
50
Energy cost10%
89
Water risk7%
82
Natural hazard6%
20
Buildability7%
15
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
94
Gas pipeline2%
87
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Baker County, ranked by DC Readiness.

Sites near OZ Baker
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121285Substation-Adjacent230 kV300 MW1.0 yrs63.7
BALDWINSubstation-Adjacent115 kV100 MW1.0 yrs59.2
UNKNOWN121319Substation-Adjacent115 kV100 MW1.0 yrs58.5
UNKNOWN121247Substation-Adjacent115 kV100 MW1.0 yrs57.8
WIREMILLSubstation-Adjacent115 kV100 MW1.0 yrs57.4
UNKNOWN121193Substation-Adjacent115 kV100 MW1.0 yrs57.2
TAP141848Substation-Adjacent115 kV100 MW1.0 yrs57.2
SANDERSONSubstation-Adjacent115 kV100 MW1.0 yrs57.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Baker, Baker County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.