Greenfield (TAP161525 - DEADEND172575)

Greenfield

Baker County, Florida · SERC

DC Readiness
45.7
Fair / 100

Greenfield (TAP161525 - DEADEND172575) is a greenfield datacenter candidate site in Baker County, Florida, interconnecting through SERC. It screens at 45.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP161525
Substation voltage115 kV
Available capacity100 MW

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPCologix JAX1
IXP distance37.1 mi
Fiber providers3
Fiber coverage26.3%

Site characteristics

Site typeGreenfield

Risk & environment

Flood zoneZone X
Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score45/100

Location context

Nearest datacenterCologix Jacksonville JAX1
DC distance37.1 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.99¢/kWh
Industrial electricity7.61¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$8,182

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power15%
75
Fiber connectivity12%
18
Energy cost10%
50
Water risk8%
76
Natural hazard8%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Baker County, ranked by DC Readiness.

Sites near Greenfield (TAP161525 - DEADEND172575)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121285Substation-Adjacent230 kV300 MW1.0 yrs59.7
BALDWINSubstation-Adjacent115 kV100 MW1.0 yrs55.2
UNKNOWN121319Substation-Adjacent115 kV100 MW1.0 yrs53.5
UNKNOWN121247Substation-Adjacent115 kV100 MW1.0 yrs53.0
OZ BakerGreenfield3.6 yrs52.6
SANDERSONSubstation-Adjacent115 kV100 MW1.0 yrs52.0
UNKNOWN121193Substation-Adjacent115 kV100 MW1.0 yrs52.0
TAP141848Substation-Adjacent115 kV100 MW1.0 yrs52.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (TAP161525 - DEADEND172575), Baker County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.