Weld County, Colorado · SPP

DC Readiness
53.2
Fair / 100

SUNCOR is a substation-adjacent datacenter candidate site in Weld County, Colorado, interconnecting through SPP. It screens at 53.2/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSUNCOR
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityPOUDRE VALLEY REA, INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth33
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPCogent Cheyenne
IXP distance37.7 mi
Fiber providers18
Fiber coverage64.5%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterDatacenter 1485867694
DC distance33.2 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.70¢/kWh
Industrial electricity9.05¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$3,798

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track SUNCOR

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
56
Fiber connectivity12%
65
Energy cost10%
50
Water risk7%
36
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Weld County, ranked by DC Readiness.

Sites near SUNCOR
SiteTypeVoltageCapacityQueue waitScore
EC Near Front Range ProjectGreenfield——4.3 yrs63.8
EC Near Front Range ProjectGreenfield——3.5 yrs63.0
AULTSubstation-Adjacent345 kV600 MW4.3 yrs61.5
EC Near Front Range ProjectGreenfield——4.3 yrs61.4
EC Near Front Range ProjectGreenfield——4.3 yrs59.9
UNKNOWN205141Substation-Adjacent230 kV300 MW4.3 yrs59.6
UNKNOWN202601Substation-Adjacent230 kV300 MW4.3 yrs59.0
WINDSORSubstation-Adjacent230 kV300 MW3.5 yrs58.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for SUNCOR, Weld County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.