Summit County, Colorado · WECC

DC Readiness
48.0
Fair / 100

PORTAL is a substation-adjacent datacenter candidate site in Summit County, Colorado, interconnecting through WECC. It screens at 48.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationPORTAL
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPBLDR-1919
IXP distance42.4 mi
Fiber providers6
Fiber coverage9.9%

Site characteristics

Risk & environment

Water stress (WRI)High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score75/100

Location context

Nearest datacenterBLDR-1919
DC distance42.4 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.19¢/kWh
Industrial electricity8.28¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$8,928

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
43
Fiber connectivity12%
13
Energy cost10%
50
Water risk8%
36
Natural hazard8%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Summit County, ranked by DC Readiness.

Sites near PORTAL
SiteTypeVoltageCapacityQueue waitScore
BRECKENRIDGESubstation-Adjacent230 kV300 MW6.9 yrs52.3
DILLIONSubstation-Adjacent230 kV300 MW6.9 yrs52.3
BLUE RIVERSubstation-Adjacent230 kV300 MW6.9 yrs52.3
MAYFLOWERSubstation-Adjacent115 kV100 MW6.9 yrs48.0
SUMMITSubstation-Adjacent115 kV100 MW6.9 yrs48.0
MILLSubstation-Adjacent115 kV100 MW6.9 yrs48.0
UNKNOWN203907Substation-Adjacent115 kV100 MW6.9 yrs47.2
VAILSubstation-Adjacent115 kV100 MW6.9 yrs47.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PORTAL, Summit County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.