UNKNOWN202209

Substation-Adjacent

Routt County, Colorado · WECC

DC Readiness
50.8
Fair / 100

UNKNOWN202209 is a substation-adjacent datacenter candidate site in Routt County, Colorado, interconnecting through WECC. It screens at 50.8/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN202209
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityYAMPA VALLEY ELECTRIC ASSN INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPSTRATA Vernal Data Center
IXP distance101.2 mi
Fiber providers7
Fiber coverage46.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterStrata Networks
DC distance101.2 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.51¢/kWh
Industrial electricity8.13¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$4,101

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN202209

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
43
Fiber connectivity12%
60
Energy cost10%
50
Water risk7%
36
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Routt County, ranked by DC Readiness.

Sites near UNKNOWN202209
SiteTypeVoltageCapacityQueue waitScore
BEARS EARSSubstation-Adjacent345 kV600 MW6.9 yrs59.4
STEAMBOATSubstation-Adjacent230 kV300 MW6.9 yrs57.6
EC Coal Routt CountyGreenfield——1.7 yrs57.6
UNKNOWN202355Substation-Adjacent230 kV300 MW6.9 yrs57.5
UNKNOWN201519Substation-Adjacent230 kV300 MW6.9 yrs57.5
HAYDENSubstation-Adjacent230 kV300 MW6.9 yrs57.5
EC Coal Routt CountyGreenfield——1.7 yrs54.3
EC Coal Routt CountyGreenfield——1.7 yrs54.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN202209, Routt County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.