Morgan, Colorado · SPP

DC Readiness
52.4
Fair / 100

TAP208153 is a substation-adjacent datacenter candidate site in Morgan, Colorado, interconnecting through SPP. It screens at 52.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP208153
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityMORGAN COUNTY RURAL ELEC ASSNcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth33
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPLunavi - Cheyenne
IXP distance59.7 mi
Fiber providers8
Fiber coverage74.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterWindbreak Cable
DC distance38.7 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.21¢/kWh
Industrial electricity11.94¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$2,717

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP208153

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
56
Fiber connectivity12%
39
Energy cost10%
50
Water risk7%
36
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Morgan, ranked by DC Readiness.

Sites near TAP208153
SiteTypeVoltageCapacityQueue waitScore
PAWNEESubstation-Adjacent345 kV600 MW4.3 yrs61.3
STORY 345KVSubstation-Adjacent345 kV600 MW4.3 yrs61.2
TAP206216Substation-Adjacent230 kV300 MW4.3 yrs59.3
TAP206215Substation-Adjacent230 kV300 MW4.3 yrs59.2
EC Near Brush Generation FacilityGreenfield——4.3 yrs57.9
EC Near Brush Generation FacilityGreenfield——4.3 yrs57.6
EC Near Brush Generation FacilityGreenfield——4.3 yrs57.2
EC Near Brush Generation FacilityGreenfield——4.3 yrs56.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for TAP208153, Morgan is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.