UNKNOWN206139

Substation-Adjacent

Montezuma County, Colorado · WECC

DC Readiness
51.9
Fair / 100

UNKNOWN206139 is a substation-adjacent datacenter candidate site in Montezuma County, Colorado, interconnecting through WECC. It screens at 51.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN206139
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityEMPIRE ELECTRIC ASSN, INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Fiber providers7
Fiber coverage34.4%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.33¢/kWh
Industrial electricity8.28¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$1,736

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN206139

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
56
Fiber connectivity12%
47
Energy cost10%
50
Water risk7%
36
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
10
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Montezuma County, ranked by DC Readiness.

Sites near UNKNOWN206139
SiteTypeVoltageCapacityQueue waitScore
OZ MontezumaGreenfield——1.7 yrs54.4
LOST CANYONSubstation-Adjacent230 kV300 MW6.9 yrs54.1
UNKNOWN208065Substation-Adjacent138 kV100 MW6.9 yrs52.5
UNKNOWN206138Substation-Adjacent115 kV100 MW6.9 yrs52.1
UNKNOWN205923Substation-Adjacent138 kV100 MW6.9 yrs50.1
UNKNOWN301857Substation-Adjacent115 kV100 MW3.3 yrs49.9
UNKNOWN206135Substation-Adjacent115 kV100 MW6.9 yrs49.7
EMPIRESubstation-Adjacent115 kV100 MW6.9 yrs49.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN206139, Montezuma County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.