Former Manufactured Gas Plant Site (Sections A&B)
IndustrialLogan County, Colorado · WECC
Former Manufactured Gas Plant Site (Sections A&B) is a industrial datacenter candidate site in Logan County, Colorado, interconnecting through WECC. It screens at 40.3/100 DC Readiness.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Logan County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| SPRING CANYON | Substation-Adjacent | 230 kV | 300 MW | 1.7 yrs | 65.6 |
| PEETZ TABLE WIND ENERGY | Substation-Adjacent | 230 kV | 300 MW | 1.7 yrs | 63.9 |
| UNKNOWN201534 | Substation-Adjacent | 230 kV | 300 MW | 1.7 yrs | 63.2 |
| UNKNOWN205871 | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 62.2 |
| STERLING | Substation-Adjacent | 138 kV | 100 MW | 1.7 yrs | 61.6 |
| PEETZ | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 60.6 |
| TAP208155 | Substation-Adjacent | 138 kV | 100 MW | 1.7 yrs | 60.5 |
| TAP205869 | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 60.4 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.