Go Ford is a industrial datacenter candidate site in Jefferson County, Colorado, interconnecting through WECC. It screens at 44.4/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionWECC
Queue depth74

Connectivity

Nearest IXPColoradoColo - Lakewood (LKWD)
IXP distance3.5 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterColoradoColo - Lakewood (LKWD)
DC distance3.5 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.95¢/kWh
Industrial electricity8.08¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$16,602

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
25
Fiber connectivity12%
75
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Jefferson County, ranked by DC Readiness.

Sites near Go Ford
SiteTypeVoltageCapacityQueue waitScore
LOOK OUTSubstation-Adjacent230 kV300 MW1.7 yrs69.5
UNKNOWN203871Substation-Adjacent230 kV300 MW1.7 yrs69.3
WATERTONSubstation-Adjacent345 kV600 MW1.7 yrs68.0
CHATFIELDSubstation-Adjacent230 kV300 MW1.7 yrs66.7
SODA LAKESubstation-Adjacent230 kV300 MW1.7 yrs66.0
LITTLETONSubstation-Adjacent115 kV100 MW1.7 yrs65.3
QUAKERSubstation-Adjacent115 kV100 MW1.7 yrs65.2
DEER CREEKSubstation-Adjacent115 kV100 MW1.7 yrs65.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Go Ford, Jefferson County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.