Skip to content
Gridcensus

Grand County, Colorado · WECC

DC Readiness
52.3
Fair / 100

BLUE RIVER is a substation-adjacent datacenter candidate site in Grand County, Colorado, interconnecting through WECC. It screens at 52.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBLUE RIVER
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityMOUNTAIN PARKS ELECTRIC, INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPBLDR-1919
IXP distance57.6 mi
Fiber providers4
Fiber coverage3.4%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterBLDR-1919
DC distance57.6 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.22¢/kWh
Industrial electricity8.20¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$2,754

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track BLUE RIVER

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
43
Fiber connectivity12%
49
Energy cost10%
50
Water risk7%
36
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Grand County, ranked by DC Readiness.

Sites near BLUE RIVER
SiteTypeVoltageCapacityQueue waitScore
GORE PASSSubstation-Adjacent230 kV300 MW6.9 yrs56.5
FRASERSubstation-Adjacent138 kV100 MW6.9 yrs53.7
WINDY GAPSubstation-Adjacent138 kV100 MW6.9 yrs52.7
UNKNOWN205909Substation-Adjacent115 kV100 MW6.9 yrs52.5
GREEN MOUTAINSubstation-Adjacent115 kV100 MW6.9 yrs51.5
UNKNOWN205905Substation-Adjacent69 kV50 MW6.9 yrs50.2
UNKNOWN205904Substation-Adjacent69 kV50 MW6.9 yrs50.2
UNKNOWN205906Substation-Adjacent69 kV50 MW6.9 yrs49.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for BLUE RIVER, Grand County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.