BURRO CANYON
Substation-AdjacentColfax, Colorado · WECC
BURRO CANYON is a substation-adjacent datacenter candidate site in Colfax, Colorado, interconnecting through WECC. It screens at 50.1/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Colfax, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Colfax | Greenfield | — | — | 3.5 yrs | 53.9 |
| EC Coal Colfax County | Greenfield | — | — | 3.5 yrs | 53.2 |
| EC Coal Colfax County | Greenfield | — | — | 3.5 yrs | 50.5 |
| EC FFE Colfax County | Greenfield | — | — | 3.5 yrs | 49.8 |
| TAP308008 | Substation-Adjacent | 115 kV | 100 MW | 3.3 yrs | 46.0 |
| SPRINGER | Substation-Adjacent | 115 kV | 100 MW | 3.3 yrs | 46.0 |
| YORK CANYON | Substation-Adjacent | 115 kV | 100 MW | 3.3 yrs | 46.0 |
| UNKNOWN306518 | Substation-Adjacent | 115 kV | 100 MW | 3.3 yrs | 46.0 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.