PONCHA JUNCTION

Substation-Adjacent

Chaffee County, Colorado · WECC

DC Readiness
53.8
Fair / 100

PONCHA JUNCTION is a substation-adjacent datacenter candidate site in Chaffee County, Colorado, interconnecting through WECC. It screens at 53.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationPONCHA JUNCTION
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityPUBLIC SERVICE CO OF COLORADOinvestor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPData102 - COS02
IXP distance71.3 mi
Fiber providers3
Fiber coverage35.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterData102 - COS01
DC distance71.3 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.01¢/kWh
Industrial electricity8.52¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$6,178

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track PONCHA JUNCTION

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
56
Fiber connectivity12%
59
Energy cost10%
50
Water risk7%
36
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Chaffee County, ranked by DC Readiness.

Sites near PONCHA JUNCTION
SiteTypeVoltageCapacityQueue waitScore
PONCHASubstation-Adjacent230 kV300 MW6.9 yrs58.1
OZ ChaffeeGreenfield——1.7 yrs55.3
UNKNOWN202251Substation-Adjacent115 kV100 MW6.9 yrs53.8
TAP205176Substation-Adjacent115 kV100 MW6.9 yrs53.8
BUENA VISTASubstation-Adjacent115 kV100 MW6.9 yrs53.7
SMELTERTOWNSubstation-Adjacent115 kV100 MW6.9 yrs53.7
TAP203990Substation-Adjacent115 kV100 MW6.9 yrs53.6
UNKNOWN203875Substation-Adjacent115 kV100 MW6.9 yrs53.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PONCHA JUNCTION, Chaffee County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.