Skip to content
Gridcensus

Fort Lyon Facility - Building 3

Industrial

Bent County, Colorado · WECC

DC Readiness
46.2
Fair / 100

Fort Lyon Facility - Building 3 is an industrial datacenter candidate site in Bent County, Colorado, interconnecting through WECC. It screens at 46.2/100 DC Readiness and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

UtilitySOUTHEAST COLORADO POWER ASSNcooperativemoderate to large load · state default

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPT5@Colorado Springs
IXP distance102.3 mi
Fiber providers0
Fiber coverage0.0%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterDatacenter 00476609221
DC distance90.6 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.58¢/kWh
Industrial electricity12.00¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$1,087

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Fort Lyon Facility - Building 3

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
56
Fiber connectivity12%
45
Energy cost10%
50
Water risk7%
36
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Bent County, ranked by DC Readiness.

Sites near Fort Lyon Facility - Building 3
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN201396Substation-Adjacent230 kV300 MW6.9 yrs56.0
UNKNOWN201315Substation-Adjacent69 kV50 MW6.9 yrs50.4
UNKNOWN203937Substation-Adjacent69 kV50 MW6.9 yrs50.3
EC Coal Bent CountyGreenfield——1.7 yrs49.3
Fort Lyon Facility – Building 226Industrial——6.9 yrs46.4
Fort Lyon Facility – Building 37Industrial——6.9 yrs46.4
Las Animas ArmoryIndustrial——6.9 yrs46.4
Fort Lyon Facility - Building 323Industrial——6.9 yrs46.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Fort Lyon Facility - Building 3, Bent County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.