UNKNOWN202745
Substation-AdjacentArapahoe County, Colorado · WECC
UNKNOWN202745 is a substation-adjacent datacenter candidate site in Arapahoe County, Colorado, interconnecting through WECC. It screens at 52.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Arapahoe County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Arapahoe | Greenfield | — | — | 1.7 yrs | 63.1 |
| Place Bridge Academy | Brownfield | 115 kV | 0 MW | 6.9 yrs | 61.0 |
| QUINCY | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 60.1 |
| BRICK CENTER | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 58.0 |
| OZ Arapahoe | Greenfield | — | — | 1.7 yrs | 57.8 |
| MISSLE SITE | Substation-Adjacent | 345 kV | 600 MW | 6.9 yrs | 56.5 |
| UNKNOWN204003 | Substation-Adjacent | 115 kV | 100 MW | 6.9 yrs | 54.7 |
| Denver Urban Gardens - Hinkley High School garden | Industrial | — | — | 6.9 yrs | 53.4 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.