Substation-Adjacent site at 37.711, -120.781

Substation-Adjacent

Stanislaus County, California · CAISO

DC Readiness
48.7
Fair / 100

At a glance

Substation-Adjacent site at 37.711, -120.781 is a substation-adjacent datacenter candidate site in Stanislaus County, California, scoring 48.7/100 DC Readiness — 42nd of 107 scored sites in the county. Its nearest substation is TAP310805 (0 mi, 69 kV). It sits in the CAISO grid region, where interconnection has averaged 7.6 years from request to operation. GridCensus catalogs 50 MW of candidate capacity here.

Power & interconnection

Nearest substationTAP310805
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

Interconnection outlookConstrained
≈ 8.3 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionCAISO
Queue depth227
Avg queue wait7.6 yrs
Recent queue wait8.3 yrs
Completion rate11%
Withdrawal rate89%

Connectivity

Nearest IXP801 Tenth Street Modesto (Ayera)
IXP distance12.9 mi
Fiber providers7
Fiber coverage23.1%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score52/100

Location context

Nearest datacenter801 Tenth Street Modesto (Ayera)
DC distance12.9 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity23.01¢/kWh
Industrial electricity17.86¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$20,208

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP310805

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Substation-Adjacent site at 37.711, -120.781 compare with other sites in Stanislaus County?

Substation-Adjacent site at 37.711, -120.781 ranks 42nd of 107 scored candidate sites in Stanislaus County. Its 48.7/100 is roughly in line with the county average of 47.0. It is roughly in line with the California average of 45.4 and roughly in line with the national average of 53.2.

Against the California average, its strongest sub-score is power availability (46 vs 36) and its weakest is water (24 vs 27). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Substation-Adjacent site at 37.711, -120.781 to power, fiber and other datacenters?

The nearest mapped substation, TAP310805, is about 0 miles away and operates at 69 kV. The nearest located transmission bottleneck is 34002_SALADO _60.0_34008_STNSLSRP_60.0_BR_1 _1 (CAISO), 5 miles away. For connectivity, the nearest internet exchange facility is 801 Tenth Street Modesto (Ayera) at 12.9 miles. 7 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is 801 Tenth Street Modesto (Ayera), 12.9 miles away.

What are the flood, water and hazard risks at Substation-Adjacent site at 37.711, -120.781?

At the county level, FEMA's National Risk Index rates Stanislaus County "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
43
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
24
Natural hazard6%
52
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
34
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Stanislaus County, ranked by DC Readiness.

Sites near Substation-Adjacent site at 37.711, -120.781
SiteTypeVoltageCapacityQueue waitScore
PRESCOTTSubstation-Adjacent230 kV300 MW7.6 yrs57.1
ROSEMORE BSubstation-Adjacent230 kV300 MW7.6 yrs57.0
PARKERSubstation-Adjacent230 kV300 MW7.6 yrs56.1
Turlock Irrigation District Fuel CellBrownfield66 kV1 MW7.6 yrs55.9
WALNUTSubstation-Adjacent230 kV300 MW7.6 yrs55.5
OZ StanislausGreenfield——7.6 yrs55.4
COTTLESubstation-Adjacent230 kV300 MW7.6 yrs55.4
WARNERVILLESubstation-Adjacent230 kV300 MW7.6 yrs55.3

Substation-Adjacent site at 37.711, -120.781: common questions

What is the DC Readiness score of Substation-Adjacent site at 37.711, -120.781?

Substation-Adjacent site at 37.711, -120.781 scores 48.7/100 on the GridCensus DC Readiness scale, rated fair. It ranks 42nd of 107 scored sites in Stanislaus County. The Stanislaus County average is 47.0 and the California average is 45.4.

What is the nearest substation to Substation-Adjacent site at 37.711, -120.781?

The nearest mapped substation is TAP310805, about 0 miles away, at 69 kV. GridCensus catalogs 50 MW of candidate capacity for the site.

What grid region is Substation-Adjacent site at 37.711, -120.781 in?

Substation-Adjacent site at 37.711, -120.781 is in the CAISO region. Projects interconnecting there have averaged a 7.6-year wait from queue request to operation.

How far is Substation-Adjacent site at 37.711, -120.781 from an internet exchange?

The nearest internet exchange facility is 801 Tenth Street Modesto (Ayera), about 12.9 miles away; 7 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Substation-Adjacent site at 37.711, -120.781, Stanislaus County, CA”, https://gridcensus.com/datacenter-sites/california/stanislaus-county/tap310805-b3242a59 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Substation-Adjacent site at 37.711, -120.781, Stanislaus County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.