Skip to content
Gridcensus

UNKNOWN308227

Substation-Adjacent

Solano County, California · CAISO

DC Readiness
47.3
Fair / 100

UNKNOWN308227 is a substation-adjacent datacenter candidate site in Solano County, California, interconnecting through CAISO. It screens at 47.3/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 8.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN308227
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW

Speed to power

ISO / RTO regionCAISO
Queue depth480
Avg queue wait8.2 yrs

Connectivity

Nearest IXPEZ Network Systems
IXP distance30.9 mi
Fiber providers7
Fiber coverage27.2%

Site characteristics

Risk & environment

Water stress (WRI)High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score52/100

Location context

Nearest datacenterPG&E Datacenter
DC distance15.2 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity29.96¢/kWh
Industrial electricity22.93¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$12,901

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
31
Fiber connectivity12%
20
Energy cost10%
50
Water risk8%
24
Natural hazard8%
52
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
34
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Solano County, ranked by DC Readiness.

Sites near UNKNOWN308227
SiteTypeVoltageCapacityQueue waitScore
American Canyon Solar FarmBrownfield115 kV3 MW8.2 yrs53.0
Coca Cola American CanyonBrownfield115 kV1 MW5.7 yrs52.7
VACA-DIXONSubstation-Adjacent500 kV1,000 MW8.2 yrs52.3
TULUCAYSubstation-Adjacent230 kV300 MW8.2 yrs50.1
OZ SolanoGreenfield5.7 yrs49.6
PARKWAYSubstation-Adjacent230 kV300 MW8.2 yrs49.5
EC FFE Solano CountyGreenfield5.7 yrs49.1
DEADEND310155Substation-Adjacent230 kV300 MW8.2 yrs48.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen