Mine Site is a former mine datacenter candidate site in Mono County, California, interconnecting through CAISO. It screens at 39.2/100 DC Readiness and a 8.2 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionCAISO
Queue depth480
Avg queue wait8.2 yrs

Connectivity

Nearest IXPUnwired FAT1 - Fresno Colocation
IXP distance85.7 mi
Fiber providers3
Fiber coverage33.9%

Site characteristics

Site typeFormer Mine
Former useMining: Nonmetal; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Water stress (WRI)High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score52/100

Location context

Nearest datacenterUnwired FAT1 - Fresno Colocation
DC distance85.7 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity24.34¢/kWh
Industrial electricity17.36¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$3,138

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
31
Fiber connectivity12%
58
Energy cost10%
50
Water risk8%
24
Natural hazard8%
52
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
34
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Mono County, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
UPPER GORGESubstation-Adjacent230 kV300 MW8.2 yrs45.0
INYOSubstation-Adjacent230 kV300 MW8.2 yrs45.0
CONTROLSubstation-Adjacent230 kV300 MW8.2 yrs45.0
MOMMOTH PACIFIC 1Substation-Adjacent115 kV100 MW8.2 yrs41.9
EC FFE Mono CountyGreenfield5.7 yrs41.2
Mine SiteFormer Mine6.9 yrs40.8
BISHOP CREEK 3Substation-Adjacent115 kV100 MW8.2 yrs40.6
CONTROL GORGESubstation-Adjacent115 kV100 MW8.2 yrs40.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.