Mine Site is a former mine datacenter candidate site in Mariposa, California, interconnecting through CAISO. It screens at 38.6/100 DC Readiness and a 8.2 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionCAISO
Queue depth480
Avg queue wait8.2 yrs

Connectivity

Nearest IXP801 Tenth Street Modesto (Ayera)
IXP distance50.1 mi
Fiber providers2
Fiber coverage7.5%

Site characteristics

Site typeFormer Mine
Former useMining: Stone; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Water stress (WRI)High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score52/100

Location context

Nearest datacenter801 Tenth Street Modesto (Ayera)
DC distance50.1 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity28.54¢/kWh
Industrial electricity21.93¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$4,306

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
31
Fiber connectivity12%
47
Energy cost10%
50
Water risk8%
24
Natural hazard8%
52
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
34
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Mariposa, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
OZ MariposaGreenfield5.7 yrs43.0
OZ MariposaGreenfield5.7 yrs40.0
Mine SiteFormer Mine8.2 yrs39.0
Mine SiteFormer Mine8.2 yrs38.9
Mine SiteFormer Mine8.2 yrs38.9
TAP310824Substation-Adjacent69 kV50 MW8.2 yrs38.9
Mine SiteFormer Mine8.2 yrs38.9
EXCHEQUERSubstation-Adjacent115 kV100 MW8.2 yrs38.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen