Skip to content
Gridcensus

Blue Lake Forest Products

Industrial

Humboldt County, California · CAISO

DC Readiness
40.6
Fair / 100

At a glance

Blue Lake Forest Products is an industrial datacenter candidate site in Humboldt County, California, scoring 40.6/100 DC Readiness — 109th of 156 scored sites in the county. It sits in the CAISO grid region and the PACIFIC GAS & ELECTRIC CO. service territory, where interconnection has averaged 7.6 years from request to operation.

Power & interconnection

UtilityPACIFIC GAS & ELECTRIC CO.investor ownedrestrictive to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookConstrained
≈ 8.3 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionCAISO
Queue depth227
Avg queue wait7.6 yrs
Recent queue wait8.3 yrs
Completion rate11%
Withdrawal rate89%

Connectivity

Nearest IXPHemlock Plaza
IXP distance80.6 mi
Fiber providers4
Fiber coverage19.7%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score52/100

Location context

Nearest datacenterHemlock Plaza
DC distance80.6 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity29.51¢/kWh
Industrial electricity22.64¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$4,578

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Blue Lake Forest Products

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Blue Lake Forest Products compare with other sites in Humboldt County?

Blue Lake Forest Products ranks 109th of 156 scored candidate sites in Humboldt County. Its 40.6/100 is roughly in line with the county average of 41.4. It is about 11% below the California average of 45.4 and about 24% below the national average of 53.2.

Against the California average, its strongest sub-score is natural hazard (52 vs 51) and its weakest is fiber connectivity (54 vs 66). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Blue Lake Forest Products to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Hemlock Plaza at 80.6 miles. 4 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Hemlock Plaza, 80.6 miles away.

What are the flood, water and hazard risks at Blue Lake Forest Products?

At the county level, FEMA's National Risk Index rates Humboldt County "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
43
Fiber connectivity12%
54
Energy cost10%
50
Water risk7%
24
Natural hazard6%
52
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
34
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Humboldt County, ranked by DC Readiness.

Sites near Blue Lake Forest Products
SiteTypeVoltageCapacityQueue waitScore
HUMBOLDT BAYSubstation-Adjacent115 kV100 MW7.6 yrs47.6
EC Near Humboldt BayGreenfield——7.6 yrs47.2
ARCATASubstation-Adjacent115 kV100 MW7.6 yrs46.7
BRIDGEVILLESubstation-Adjacent115 kV100 MW7.6 yrs46.6
HUMBOLDTSubstation-Adjacent115 kV100 MW7.6 yrs46.5
OZ HumboldtGreenfield——7.6 yrs44.8
RIO DELLSubstation-Adjacent69 kV50 MW7.6 yrs44.7
EUREKA STA ESubstation-Adjacent69 kV50 MW7.6 yrs44.7

Blue Lake Forest Products: common questions

What is the DC Readiness score of Blue Lake Forest Products?

Blue Lake Forest Products scores 40.6/100 on the GridCensus DC Readiness scale, rated fair. It ranks 109th of 156 scored sites in Humboldt County. The Humboldt County average is 41.4 and the California average is 45.4.

Which electric utility serves Blue Lake Forest Products?

PACIFIC GAS & ELECTRIC CO. (investor owned) holds the retail service territory that contains the site; its holding company is PACIFIC GAS & ELECTRIC CORPORATION.

What grid region is Blue Lake Forest Products in?

Blue Lake Forest Products is in the CAISO region. Projects interconnecting there have averaged a 7.6-year wait from queue request to operation.

How far is Blue Lake Forest Products from an internet exchange?

The nearest internet exchange facility is Hemlock Plaza, about 80.6 miles away; 4 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Blue Lake Forest Products, Humboldt County, CA”, https://gridcensus.com/datacenter-sites/california/humboldt-county/blue-lake-forest-products-ee757e57 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Blue Lake Forest Products, Humboldt County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.