Esmeralda County, California · CAISO

DC Readiness
47.4
Fair / 100

BIG PINE is a substation-adjacent datacenter candidate site in Esmeralda County, California, interconnecting through CAISO. It screens at 47.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 8.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBIG PINE
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityLOS ANGELES DEPARTMENT OF WATER & POWERmunicipalrestrictive to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookConstrained
≈ 8.2 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionCAISO
Queue depth227
Avg queue wait8.2 yrs

Connectivity

Nearest IXPUnwired FAT1 - Fresno Colocation
IXP distance83.9 mi
Fiber providers1
Fiber coverage0.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Extremely High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score88/100

Location context

Nearest datacenterUnwired FAT1 - Fresno Colocation
DC distance83.9 mi
County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (sales_tax_abatement)
Commercial electricity8.55¢/kWh
Industrial electricity7.09¢/kWh
Cooling degree days2,000
Heating degree days3,700
Land price / acre$3,086

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track BIG PINE

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
41
Fiber connectivity12%
45
Energy cost10%
50
Water risk7%
10
Natural hazard6%
88
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
54
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
25

Nearby comparable sites

Other scored datacenter candidate sites in Esmeralda County, ranked by DC Readiness.

Sites near BIG PINE
SiteTypeVoltageCapacityQueue waitScore
ANACONDASubstation-Adjacent230 kV300 MW6.9 yrs55.5
BLM Solar DLA: MillersGreenfield—4,467 MW5.8 yrs53.8
BLM Solar DLA: Gold PointGreenfield—1,216 MW5.8 yrs52.1
ALKALISubstation-Adjacent120 kV100 MW6.9 yrs51.2
UNKNOWN303001Substation-Adjacent120 kV100 MW6.9 yrs51.2
SILVER PEAKSubstation-Adjacent120 kV100 MW6.9 yrs51.2
N.O. MILLERSSubstation-Adjacent120 kV100 MW6.9 yrs51.2
TONOPAHSubstation-Adjacent120 kV100 MW6.9 yrs51.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BIG PINE, Esmeralda County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.