Contra Costa County, California · CAISO

DC Readiness
53.4
Fair / 100

WIND DRIVER is a substation-adjacent datacenter candidate site in Contra Costa County, California, interconnecting through CAISO. It screens at 53.4/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 8.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationWIND DRIVER
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
UtilityPACIFIC GAS & ELECTRIC CO.investor ownedrestrictive to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookConstrained
≈ 8.2 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionCAISO
Queue depth227
Avg queue wait8.2 yrs

Connectivity

Nearest IXPEZ Network Systems
IXP distance23.4 mi
Fiber providers6
Fiber coverage42.5%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score52/100

Location context

Nearest datacenterQES Computers
DC distance15.7 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity29.96¢/kWh
Industrial electricity22.93¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$9,199

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track WIND DRIVER

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
40
Fiber connectivity12%
66
Energy cost10%
50
Water risk7%
24
Natural hazard6%
52
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
34
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Contra Costa County, ranked by DC Readiness.

Sites near WIND DRIVER
SiteTypeVoltageCapacityQueue waitScore
EMBARCADEROSubstation-Adjacent230 kV300 MW8.2 yrs59.5
BAHIASubstation-Adjacent230 kV300 MW8.2 yrs56.2
MORAGASubstation-Adjacent230 kV300 MW8.2 yrs55.9
SOBRANTESubstation-Adjacent230 kV300 MW8.2 yrs55.9
Phillips 66 Carbon PlantBrownfield60 kV27 MW5.7 yrs55.5
ROSSMOORSubstation-Adjacent230 kV300 MW8.2 yrs55.4
ROSSMOOR TAP 2Substation-Adjacent230 kV300 MW8.2 yrs55.4
TECHNICAL ECOLOGICAL S. R. RESEARCH CENTERSubstation-Adjacent230 kV300 MW8.2 yrs55.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WIND DRIVER, Contra Costa County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.