Skip to content
Gridcensus

Alameda, California · CAISO

DC Readiness
54.8
Fair / 100

At a glance

FLOWIND CORP is a substation-adjacent datacenter candidate site in Alameda, California, scoring 54.8/100 DC Readiness — 25th of 313 scored sites in the county. Its nearest substation is FLOWIND CORP (0 mi, 230 kV). It sits in the CAISO grid region and the PACIFIC GAS & ELECTRIC CO. service territory, where interconnection has averaged 7.6 years from request to operation. GridCensus catalogs 300 MW of candidate capacity here.

Power & interconnection

Nearest substationFLOWIND CORP
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
UtilityPACIFIC GAS & ELECTRIC CO.investor ownedrestrictive to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookConstrained
≈ 8.3 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionCAISO
Queue depth227
Avg queue wait7.6 yrs
Recent queue wait8.3 yrs
Completion rate11%
Withdrawal rate89%

Connectivity

Nearest IXPEZ Network Systems
IXP distance23.6 mi
Fiber providers12
Fiber coverage64.4%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score52/100

Location context

Nearest datacenterQES Computers
DC distance16.4 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity29.86¢/kWh
Industrial electricity22.93¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$13,473

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track FLOWIND CORP

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does FLOWIND CORP compare with other sites in Alameda?

FLOWIND CORP ranks 25th of 313 scored candidate sites in Alameda. Its 54.8/100 is about 11% above the county average of 49.4. It is about 21% above the California average of 45.4 and roughly in line with the national average of 53.2.

Against the California average, its strongest sub-score is power availability (78 vs 36) and its weakest is water (24 vs 27). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is FLOWIND CORP to power, fiber and other datacenters?

The nearest mapped substation, FLOWIND CORP, is about 0 miles away and operates at 230 kV. The nearest located transmission bottleneck is 33916_CURTISS _115_33917_FBERBORD_115_BR_1 _1 (CAISO), 19 miles away. For connectivity, the nearest internet exchange facility is EZ Network Systems at 23.6 miles. 12 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is QES Computers, 16.4 miles away.

What are the flood, water and hazard risks at FLOWIND CORP?

At the county level, FEMA's National Risk Index rates Alameda "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
43
Fiber connectivity12%
73
Energy cost10%
50
Water risk7%
24
Natural hazard6%
52
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
34
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Alameda, ranked by DC Readiness.

Sites near FLOWIND CORP
SiteTypeVoltageCapacityQueue waitScore
TESLA Power ProjectBrownfield500 kV1,322 MW7.6 yrs66.5
NEWARK DISTRIBUTIONSubstation-Adjacent230 kV300 MW7.6 yrs59.3
TESLASubstation-Adjacent500 kV1,000 MW7.6 yrs59.2
EASTSHORESubstation-Adjacent230 kV300 MW7.6 yrs58.7
LOS ESTEROSSubstation-Adjacent230 kV300 MW7.6 yrs58.6
FREMONTSubstation-Adjacent230 kV300 MW7.6 yrs58.4
Juniper Networks SunnyvaleBrownfield115 kV1 MW7.6 yrs58.1
CASTRO VALLEYSubstation-Adjacent230 kV300 MW7.6 yrs57.5

FLOWIND CORP: common questions

What is the DC Readiness score of FLOWIND CORP?

FLOWIND CORP scores 54.8/100 on the GridCensus DC Readiness scale, rated fair. It ranks 25th of 313 scored sites in Alameda. The Alameda average is 49.4 and the California average is 45.4.

What is the nearest substation to FLOWIND CORP?

The nearest mapped substation is FLOWIND CORP, about 0 miles away, at 230 kV. GridCensus catalogs 300 MW of candidate capacity for the site.

Which electric utility serves FLOWIND CORP?

PACIFIC GAS & ELECTRIC CO. (investor owned) holds the retail service territory that contains the site; its holding company is PACIFIC GAS & ELECTRIC CORPORATION.

What grid region is FLOWIND CORP in?

FLOWIND CORP is in the CAISO region. Projects interconnecting there have averaged a 7.6-year wait from queue request to operation.

How far is FLOWIND CORP from an internet exchange?

The nearest internet exchange facility is EZ Network Systems, about 23.6 miles away; 12 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “FLOWIND CORP, Alameda, CA”, https://gridcensus.com/datacenter-sites/california/alameda/flowind-corp-c0d70821 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for FLOWIND CORP, Alameda is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.